Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | Repair and overhaul of Gas Turbine Engines |
NAICS | n/a |
SIC | 3724 - Aircraft Engines And Engine Parts |
Sales | $100,000,000-$500,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 816 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $245,622 | 9,004,689 | kWh | $0.03 |
Electricity Demand | $144,035 | 16,734 | kW-months/year | $8.61 |
Electricity Fees | $16,582 | - | $ | - |
Natural Gas | $107,659 | 25,861 | MMBtu | $4.16 |
TOTAL ENERGY COSTS | $513,898 | |||
RECOMMENDED SAVINGS* | $607,630 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $464,022 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | gal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,330 Cost: $112 |
$1,330 | 45,721 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,330 45,721 kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7122 DISCONNECT BALLASTS |
Savings: $946 Cost: $80 |
$946 | 10,844 | - | - | - | - | - | - | - | - | - | - | - | - |
$946 10,844 kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,515 Cost: $4,140 |
- | - | $1,515 | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$1,515 - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $379 Cost: $648 |
$379 | 1,172 | - | - | - | - | - | - | - | - | - | - | - | - |
$379 1,172 kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $33,645 Cost: $34,820 |
$33,645 | 1,155,920 | - | - | - | - | - | - | - | - | - | - | - | - |
$33,645 1,155,920 kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $6,850 Cost: - |
$6,850 | 235,346 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,850 235,346 kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $17,068 Cost: - |
- | - | - | - | $17,068 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - $ |
$17,068 - MMBtu |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $3,183 Cost: $576 |
- | - | - | - | - | - | - | - | $3,183 | 100,000 | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - gal |
$3,183 100,000 lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,080 Cost: $55 |
- | - | - | - | - | - | - | - | $1,080 | - | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - gal |
$1,080 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $458,008 Cost: $16,192 |
- | - | - | - | - | - | $458,008 | 4,422 | - | - | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
$458,008 4,422 gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $426 Cost: - |
- | - | - | - | - | - | - | - | - | - | $426 | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
$426 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $83,200 Cost: $1,673 |
- | - | - | - | - | - | - | - | - | - | - | - | $83,200 | - |
- - kWh |
- - $ |
- - MMBtu |
- - gal |
- - lb |
- - lb |
$83,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $607,630 Cost: $58,296 |
$43,150 | 1,449,003 | $1,515 | - | $17,068 | - | $458,008 | 4,422 | $4,263 | 100,000 | $426 | - | $83,200 | - | $43,150 1,449,003 kWh |
$1,515 - $ |
$17,068 - MMBtu |
$458,008 4,422 gal |
$4,263 100,000 lb |
$426 - lb |
$83,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $464,022 Cost: $17,551 |
$1,325 | 12,016 | - | - | - | - | $458,008 | 4,422 | $4,263 | 100,000 | $426 | - | - | - | $1,325 12,016 kWh |
- - $ |
- - MMBtu |
$458,008 4,422 gal |
$4,263 100,000 lb |
$426 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | gal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material |