IAC logo
IAC Assessment: WV0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Handblown glass
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $5,000,000-$10,000,000
# of Employees 137
Plant Area (Sq.Ft.) 80,000
Annual Production 260,000 Pieces
Production Hrs. Annual 4,896
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,672 616,647 kWh $0.05
Natural Gas $509,601 166,770 MMBtu $3.06
TOTAL ENERGY COSTS $540,273
RECOMMENDED SAVINGS* $356,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $231,527
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ lb $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$210
Cost:
$200
$210 4,103 - - - - - - - - $210
4,103
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$161
Cost:
$125
$161 3,224 - - - - - - - - $161
3,224
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$685
Cost:
$1,090
$685 13,775 - - - - - - - - $685
13,775
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$229,919
Cost:
$1,000
- - $229,919 75,137 - - - - - - -
-
kWh
$229,919
75,137
MMBtu
-
-
lb
-
-
lb
-
-
$
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$9,278
Cost:
$2,760
- - $9,278 3,032 - - - - - - -
-
kWh
$9,278
3,032
MMBtu
-
-
lb
-
-
lb
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$69,389
Cost:
$17,840
- - $69,389 22,676 - - - - - - -
-
kWh
$69,389
22,676
MMBtu
-
-
lb
-
-
lb
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,338
Cost:
-
- - $1,338 437 - - - - - - -
-
kWh
$1,338
437
MMBtu
-
-
lb
-
-
lb
-
-
$
08: 2.1224 REPLACE BOILER Savings:
$1,371
Cost:
$9,000
- - $1,371 448 - - - - - - -
-
kWh
$1,371
448
MMBtu
-
-
lb
-
-
lb
-
-
$
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$60
Cost:
-
- - - - - - $60 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$60
-
lb
-
-
$
10: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,900
Cost:
$100
- - - - $1,900 - - - - - -
-
kWh
-
-
MMBtu
$1,900
-
lb
-
-
lb
-
-
$
11: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$42,323
Cost:
$8,219
- - - - - - - - $42,323 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
lb
$42,323
-
$
TOTAL RECOMMENDED Savings:
$356,634
Cost:
$40,334
$1,056 21,102 $311,295 101,730 $1,900 - $60 - $42,323 - $1,056
21,102
kWh
$311,295
101,730
MMBtu
$1,900
-
lb
$60
-
lb
$42,323
-
$
TOTAL IMPLEMENTED Savings:
$231,527
Cost:
$1,200
$210 4,103 $231,257 75,574 - - $60 - - - $210
4,103
kWh
$231,257
75,574
MMBtu
-
-
lb
$60
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes