IAC Assessment: WV0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Glass fabrication and tempering
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 48,000
Annual Production 4,800 Tons
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,009 2,054,514 kWh $0.05
Natural Gas $2,208 260 MMBtu $8.49
TOTAL ENERGY COSTS $96,217
RECOMMENDED SAVINGS* $15,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,608
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$302
Cost:
$400
$302 6,741 - - - - $302
6,741
kWh
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$121
Cost:
$225
$121 2,638 - - - - $121
2,638
kWh
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$270
Cost:
$450
$270 5,862 - - - - $270
5,862
kWh
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$697
Cost:
-
$697 15,240 - - - - $697
15,240
kWh
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,419
Cost:
$4,965
$3,419 74,736 - - - - $3,419
74,736
kWh
-
-
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,120
Cost:
$300
- - $1,120 20,000 - - -
-
kWh
$1,120
20,000
lb
-
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,300
Cost:
$40
- - $1,300 130,000 - - -
-
kWh
$1,300
130,000
lb
-
-
$
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,500
Cost:
$500
- - $1,500 - - - -
-
kWh
$1,500
-
lb
-
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$6,500
Cost:
-
- - - - $6,500 - -
-
kWh
-
-
lb
$6,500
-
$
TOTAL RECOMMENDED Savings:
$15,229
Cost:
$6,880
$4,809 105,217 $3,920 150,000 $6,500 - $4,809
105,217
kWh
$3,920
150,000
lb
$6,500
-
$
TOTAL IMPLEMENTED Savings:
$13,608
Cost:
$6,155
$4,688 102,579 $2,420 150,000 $6,500 - $4,688
102,579
kWh
$2,420
150,000
lb
$6,500
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes