IAC logo
IAC Assessment: WV0179
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0179
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Electrical products
NAICS n/a
SIC 3743 - Railroad Equipment
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 210,000
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,149 1,656,506 kWh $0.06
Natural Gas $41,463 7,407 MMBtu $5.60
TOTAL ENERGY COSTS $139,612
RECOMMENDED SAVINGS* $69,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,745
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$163
Cost:
$312
$163 2,638 - - - - - - - - $163
2,638
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$200
Cost:
$174
$200 3,517 - - - - - - - - $200
3,517
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$455
Cost:
$270
$455 7,620 - - - - - - - - $455
7,620
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,465
Cost:
$7,820
$2,465 41,618 - - - - - - - - $2,465
41,618
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$218
Cost:
$36
$218 3,810 - - - - - - - - $218
3,810
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,773
Cost:
$7,500
- - $1,773 329 - - - - - - -
-
kWh
$1,773
329
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$574
Cost:
$54
$574 9,672 - - - - - - - - $574
9,672
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,109
Cost:
$675
- - $1,109 198 - - - - - - -
-
kWh
$1,109
198
MMBtu
-
-
gal
-
-
lb
-
-
$
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$834
Cost:
$1,308
$834 14,068 - - - - - - - - $834
14,068
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$54,372
Cost:
$16,000
- - - - $54,372 1,734 - - - - -
-
kWh
-
-
MMBtu
$54,372
1,734
gal
-
-
lb
-
-
$
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$130
Cost:
$80
- - - - - - $130 - - - -
-
kWh
-
-
MMBtu
-
-
gal
$130
-
lb
-
-
$
12: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$47
Cost:
$60
- - - - - - $47 4,680 - - -
-
kWh
-
-
MMBtu
-
-
gal
$47
4,680
lb
-
-
$
13: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$7,488
Cost:
$1,288
- - - - - - - - $7,488 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$7,488
-
$
TOTAL RECOMMENDED Savings:
$69,828
Cost:
$35,577
$4,909 82,943 $2,882 527 $54,372 1,734 $177 4,680 $7,488 - $4,909
82,943
kWh
$2,882
527
MMBtu
$54,372
1,734
gal
$177
4,680
lb
$7,488
-
$
TOTAL IMPLEMENTED Savings:
$59,745
Cost:
$26,389
$2,444 41,325 $2,882 527 $54,372 1,734 $47 4,680 - - $2,444
41,325
kWh
$2,882
527
MMBtu
$54,372
1,734
gal
$47
4,680
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes