IAC Assessment: WV0183
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0183
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2000
Principal Product Speciality Chemicals
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $1,000,000-$5,000,000
# of Employees 180
Plant Area (Sq.Ft.) 413,820
Annual Production 0 Pounds
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $287,086 12,949,297 kWh $0.02
Electricity Demand $136,954 19,158 kW-months/year $7.15
Electricity Fees $167,525 - $ -
Natural Gas $1,085,421 311,556 MMBtu $3.48
TOTAL ENERGY COSTS $1,676,986
RECOMMENDED SAVINGS* $228,507 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,150
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$9,583
Cost:
$50,000
$9,583 292,790 - - - - - - $9,583
292,790
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$50,000
Cost:
$13,000
- - $50,000 40,000 - - - - -
-
kWh
$50,000
40,000
MMBtu
-
-
Tgal
-
-
$
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,279
Cost:
$2,450
- - $2,279 655 - - - - -
-
kWh
$2,279
655
MMBtu
-
-
Tgal
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$1,074
Cost:
$3,450
$1,074 32,825 - - - - - - $1,074
32,825
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$13,112
Cost:
$550
- - $13,112 3,768 - - - - -
-
kWh
$13,112
3,768
MMBtu
-
-
Tgal
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$14,087
Cost:
$10,840
- - $14,087 4,048 - - - - -
-
kWh
$14,087
4,048
MMBtu
-
-
Tgal
-
-
$
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$34,536
Cost:
$10,840
- - $34,536 9,924 - - - - -
-
kWh
$34,536
9,924
MMBtu
-
-
Tgal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$355
Cost:
$528
$355 10,844 - - - - - - $355
10,844
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$336
Cost:
$100
$336 10,258 - - - - - - $336
10,258
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$18,683
Cost:
$1,000
- - $18,683 5,369 - - - - -
-
kWh
$18,683
5,369
MMBtu
-
-
Tgal
-
-
$
11: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM Savings:
$53,063
Cost:
$100,000
- - $53,063 15,248 - - - - -
-
kWh
$53,063
15,248
MMBtu
-
-
Tgal
-
-
$
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$17,828
Cost:
$10,000
- - - - $17,828 4,535 - - -
-
kWh
-
-
MMBtu
$17,828
4,535
Tgal
-
-
$
13: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,587
Cost:
$3,000
- - - - $1,587 690 - - -
-
kWh
-
-
MMBtu
$1,587
690
Tgal
-
-
$
14: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$11,984
Cost:
$1,500
- - - - - - $11,984 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$11,984
-
$
TOTAL RECOMMENDED Savings:
$228,507
Cost:
$207,258
$11,348 346,717 $185,760 79,012 $19,415 5,225 $11,984 - $11,348
346,717
kWh
$185,760
79,012
MMBtu
$19,415
5,225
Tgal
$11,984
-
$
TOTAL IMPLEMENTED Savings:
$82,150
Cost:
$15,078
$355 10,844 $81,795 49,137 - - - - $355
10,844
kWh
$81,795
49,137
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes