IAC logo
IAC Assessment: WV0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2000
Principal Product Automotive parts
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 0 Units
Production Hrs. Annual 4,056
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,840 1,883,939 kWh $0.06
Natural Gas $48,381 5,349 MMBtu $9.04
TOTAL ENERGY COSTS $158,221
RECOMMENDED SAVINGS* $55,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,749
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ Tgal $ lb $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$734
Cost:
$3,000
$734 12,603 - - - - - - - - $734
12,603
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$683
Cost:
$240
$683 11,723 - - - - - - - - $683
11,723
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,858
Cost:
$6,900
- - $5,858 648 - - - - - - -
-
kWh
$5,858
648
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$397
Cost:
$417
$397 6,741 - - - - - - - - $397
6,741
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,368
Cost:
$4,872
$4,368 74,736 - - - - - - - - $4,368
74,736
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,368
Cost:
$400
$3,368 57,737 - - - - - - - - $3,368
57,737
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$13,587
Cost:
$200
- - $13,587 - - - - - - - -
-
kWh
$13,587
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,960
Cost:
$800
- - - - - - $12,960 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$12,960
-
lb
-
-
$
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$5,851
Cost:
$1,850
- - - - $5,851 1,200,000 - - - - -
-
kWh
-
-
MMBtu
$5,851
1,200,000
Tgal
-
-
lb
-
-
$
10: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$8,000
Cost:
$500
- - - - - - - - $8,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$8,000
-
$
TOTAL RECOMMENDED Savings:
$55,806
Cost:
$19,179
$9,550 163,540 $19,445 648 $5,851 1,200,000 $12,960 - $8,000 - $9,550
163,540
kWh
$19,445
648
MMBtu
$5,851
1,200,000
Tgal
$12,960
-
lb
$8,000
-
$
TOTAL IMPLEMENTED Savings:
$25,749
Cost:
$10,207
$1,080 18,464 $5,858 648 $5,851 1,200,000 $12,960 - - - $1,080
18,464
kWh
$5,858
648
MMBtu
$5,851
1,200,000
Tgal
$12,960
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes