IAC logo
IAC Assessment: WV0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2000
Principal Product Corrugated Paperboard
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 72,000
Annual Production 300,000 Thousand Feet
Production Hrs. Annual 4,680
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,076 1,706,038 kWh $0.06
Natural Gas $77,550 21,596 MMBtu $3.59
TOTAL ENERGY COSTS $182,626
RECOMMENDED SAVINGS* $37,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,269
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ MMBtu $ lb $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,939
Cost:
$3,252
- - $6,939 1,933 - - - - -
-
kWh
$6,939
1,933
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$808
Cost:
$275
- - $808 225 - - - - -
-
kWh
$808
225
MMBtu
-
-
lb
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$937
Cost:
$500
- - $937 261 - - - - -
-
kWh
$937
261
MMBtu
-
-
lb
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,348
Cost:
$1,368
- - $2,348 327 - - - - -
-
kWh
$2,348
327
MMBtu
-
-
lb
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,494
Cost:
$664
$4,494 72,978 - - - - - - $4,494
72,978
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$531
Cost:
$154
$531 8,499 - - - - - - $531
8,499
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$908
Cost:
$912
$908 14,654 - - - - - - $908
14,654
kWh
-
-
MMBtu
-
-
lb
-
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$4,000
Cost:
$863
- - - - $4,000 - - - -
-
kWh
-
-
MMBtu
$4,000
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,880
Cost:
$100
- - - - $2,880 - - - -
-
kWh
-
-
MMBtu
$2,880
-
lb
-
-
$
10: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,000
Cost:
$400
- - - - $2,000 - - - -
-
kWh
-
-
MMBtu
$2,000
-
lb
-
-
$
11: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$11,700
Cost:
$500
- - - - - - $11,700 - -
-
kWh
-
-
MMBtu
-
-
lb
$11,700
-
$
TOTAL RECOMMENDED Savings:
$37,545
Cost:
$8,988
$5,933 96,131 $11,032 2,746 $8,880 - $11,700 - $5,933
96,131
kWh
$11,032
2,746
MMBtu
$8,880
-
lb
$11,700
-
$
TOTAL IMPLEMENTED Savings:
$35,269
Cost:
$8,059
$5,402 87,632 $9,287 2,260 $8,880 - $11,700 - $5,402
87,632
kWh
$9,287
2,260
MMBtu
$8,880
-
lb
$11,700
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $