Assessment Year | 2000 |
Principal Product | Pultrusion Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 188 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 24,000 Thousand Feet |
Production Hrs. Annual | 6,864 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $147,844 | 4,489,742 | kWh | $0.03 |
Electricity Demand | $177,303 | 9,738 | kW-months/year | $18.21 |
Electricity Fees | $224 | - | $ | - |
Natural Gas | $19,298 | 3,160 | MMBtu | $6.11 |
TOTAL ENERGY COSTS | $344,669 | |||
RECOMMENDED SAVINGS* | $47,734 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,468 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $321 Cost: $80 |
$321 | 9,379 | - | - | - | - | - | - | - | - |
$321 9,379 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,521 Cost: $3,970 |
$2,521 | 76,495 | - | - | - | - | - | - | - | - |
$2,521 76,495 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,584 Cost: $699 |
- | - | $11,584 | 855 | - | - | - | - | - | - |
- - kWh |
$11,584 855 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $264 Cost: $298 |
- | - | $264 | 43 | - | - | - | - | - | - |
- - kWh |
$264 43 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $11,981 Cost: $688 |
$11,981 | 184,056 | - | - | - | - | - | - | - | - |
$11,981 184,056 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $745 Cost: $432 |
$745 | 22,567 | - | - | - | - | - | - | - | - |
$745 22,567 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $950 Cost: $20 |
$950 | 28,722 | - | - | - | - | - | - | - | - |
$950 28,722 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $328 Cost: $401 |
$328 | 2,345 | - | - | - | - | - | - | - | - |
$328 2,345 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,040 Cost: $150 |
- | - | - | - | $2,040 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$2,040 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $2,000 Cost: $658 |
- | - | - | - | - | - | - | - | $2,000 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $15,000 Cost: $275 |
- | - | - | - | - | - | $15,000 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$15,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,734 Cost: $7,671 |
$16,846 | 323,564 | $11,848 | 898 | $2,040 | - | $15,000 | - | $2,000 | - | $16,846 323,564 kWh |
$11,848 898 MMBtu |
$2,040 - lb |
$15,000 - $ |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,468 Cost: $2,336 |
$13,580 | 224,502 | $11,848 | 898 | $2,040 | - | - | - | - | - | $13,580 224,502 kWh |
$11,848 898 MMBtu |
$2,040 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |