Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2000 |
Principal Product | Pultrusion Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 188 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 24,000 Thousand Feet |
Production Hrs. Annual | 6,864 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $147,844 | 4,489,742 | kWh | $0.03 |
Electricity Demand | $177,303 | 9,738 | kW-months/year | $18.21 |
Electricity Fees | $224 | - | $ | - |
Natural Gas | $19,298 | 3,160 | MMBtu | $6.11 |
TOTAL ENERGY COSTS | $344,669 | |||
RECOMMENDED SAVINGS* | $47,734 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,468 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $321 Cost: $80 |
$321 | 9,379 | - | - | - | - | - | - | - | - |
$321 9,379 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,521 Cost: $3,970 |
$2,521 | 76,495 | - | - | - | - | - | - | - | - |
$2,521 76,495 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,584 Cost: $699 |
- | - | $11,584 | 855 | - | - | - | - | - | - |
- - kWh |
$11,584 855 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $264 Cost: $298 |
- | - | $264 | 43 | - | - | - | - | - | - |
- - kWh |
$264 43 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $11,981 Cost: $688 |
$11,981 | 184,056 | - | - | - | - | - | - | - | - |
$11,981 184,056 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $745 Cost: $432 |
$745 | 22,567 | - | - | - | - | - | - | - | - |
$745 22,567 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $950 Cost: $20 |
$950 | 28,722 | - | - | - | - | - | - | - | - |
$950 28,722 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $328 Cost: $401 |
$328 | 2,345 | - | - | - | - | - | - | - | - |
$328 2,345 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,040 Cost: $150 |
- | - | - | - | $2,040 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$2,040 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $2,000 Cost: $658 |
- | - | - | - | - | - | - | - | $2,000 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $15,000 Cost: $275 |
- | - | - | - | - | - | $15,000 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$15,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,734 Cost: $7,671 |
$16,846 | 323,564 | $11,848 | 898 | $2,040 | - | $15,000 | - | $2,000 | - | $16,846 323,564 kWh |
$11,848 898 MMBtu |
$2,040 - lb |
$15,000 - $ |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,468 Cost: $2,336 |
$13,580 | 224,502 | $11,848 | 898 | $2,040 | - | - | - | - | - | $13,580 224,502 kWh |
$11,848 898 MMBtu |
$2,040 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |