Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2000 |
Principal Product | Flexible packaging material |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 576,000 Thousand Feet |
Production Hrs. Annual | 7,056 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $388,159 | 11,631,301 | kWh | $0.03 |
Electricity Demand | $246,752 | 21,570 | kW-months/year | $11.44 |
Electricity Fees | $21,537 | - | $ | - |
Natural Gas | $420,842 | 95,164 | MMBtu | $4.42 |
TOTAL ENERGY COSTS | $1,077,290 | |||
RECOMMENDED SAVINGS* | $124,973 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,133 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Primary Product | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $286 Cost: $50 |
$286 | 9,086 | - | - | - | - | - | - | - | - |
$286 9,086 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $813 Cost: $23 |
$813 | 25,791 | - | - | - | - | - | - | - | - |
$813 25,791 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,257 Cost: $242 |
$1,257 | 39,859 | - | - | - | - | - | - | - | - |
$1,257 39,859 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $669 Cost: $610 |
$669 | 4,982 | - | - | - | - | - | - | - | - |
$669 4,982 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $7,365 Cost: $920 |
$7,365 | 144,490 | - | - | - | - | - | - | - | - |
$7,365 144,490 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $58,583 Cost: $15,828 |
- | - | $58,583 | 13,254 | - | - | - | - | - | - |
- - kWh |
$58,583 13,254 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $28,800 Cost: $1,579 |
- | - | - | - | $28,800 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$28,800 - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $7,200 Cost: $200 |
- | - | - | - | - | - | $7,200 | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
$7,200 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $20,000 Cost: $9,800 |
- | - | - | - | - | - | - | - | $20,000 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$20,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $124,973 Cost: $29,252 |
$10,390 | 224,208 | $58,583 | 13,254 | $28,800 | - | $7,200 | - | $20,000 | - | $10,390 224,208 kWh |
$58,583 13,254 MMBtu |
$28,800 - gal |
$7,200 - lb |
$20,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,133 Cost: $1,603 |
$9,133 | 184,349 | - | - | - | - | - | - | - | - | $9,133 184,349 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Primary Product | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Primary Product |