Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2001 |
Principal Product | Equipment for Steel, Aluminium Mills |
NAICS | n/a |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 120 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,304 | 725,674 | kWh | $0.07 |
Natural Gas | $20,580 | 2,632 | MMBtu | $7.82 |
TOTAL ENERGY COSTS | $67,884 | |||
RECOMMENDED SAVINGS* | $21,985 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,710 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $346 Cost: $459 |
$346 | 5,275 | - | - | - | - | - | - | - | - |
$346 5,275 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $120 Cost: $118 |
$120 | 1,758 | - | - | - | - | - | - | - | - |
$120 1,758 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $420 Cost: $80 |
$420 | 6,448 | - | - | - | - | - | - | - | - |
$420 6,448 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,671 Cost: $763 |
$2,671 | 41,032 | - | - | - | - | - | - | - | - |
$2,671 41,032 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $116 Cost: $200 |
$116 | 1,758 | - | - | - | - | - | - | - | - |
$116 1,758 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $806 Cost: $681 |
$806 | 4,689 | - | - | - | - | - | - | - | - |
$806 4,689 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $549 Cost: $1,551 |
$549 | 8,499 | - | - | - | - | - | - | - | - |
$549 8,499 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $673 Cost: $1,117 |
- | - | $673 | 86 | - | - | - | - | - | - |
- - kWh |
$673 86 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,080 Cost: $50 |
- | - | - | - | $1,080 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$1,080 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $144 Cost: $50 |
- | - | - | - | $144 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$144 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $60 Cost: - |
- | - | - | - | - | - | $60 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$60 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $15,000 Cost: $4,272 |
- | - | - | - | - | - | - | - | $15,000 | - |
- - kWh |
- - MMBtu |
- - lb |
- - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,985 Cost: $9,341 |
$5,028 | 69,459 | $673 | 86 | $1,224 | - | $60 | - | $15,000 | - | $5,028 69,459 kWh |
$673 86 MMBtu |
$1,224 - lb |
$60 - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,710 Cost: $3,243 |
$4,566 | 62,426 | - | - | $144 | - | - | - | - | - | $4,566 62,426 kWh |
- - MMBtu |
$144 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes |