IAC logo
IAC Assessment: WV0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Equipment for Steel, Aluminium Mills
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 38,000
Annual Production 120 Pieces
Production Hrs. Annual 2,210
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,304 725,674 kWh $0.07
Natural Gas $20,580 2,632 MMBtu $7.82
TOTAL ENERGY COSTS $67,884
RECOMMENDED SAVINGS* $21,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,710
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ lb $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$346
Cost:
$459
$346 5,275 - - - - - - - - $346
5,275
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$120
Cost:
$118
$120 1,758 - - - - - - - - $120
1,758
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$420
Cost:
$80
$420 6,448 - - - - - - - - $420
6,448
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,671
Cost:
$763
$2,671 41,032 - - - - - - - - $2,671
41,032
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$116
Cost:
$200
$116 1,758 - - - - - - - - $116
1,758
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$806
Cost:
$681
$806 4,689 - - - - - - - - $806
4,689
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$549
Cost:
$1,551
$549 8,499 - - - - - - - - $549
8,499
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$673
Cost:
$1,117
- - $673 86 - - - - - - -
-
kWh
$673
86
MMBtu
-
-
lb
-
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,080
Cost:
$50
- - - - $1,080 - - - - - -
-
kWh
-
-
MMBtu
$1,080
-
lb
-
-
lb
-
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$144
Cost:
$50
- - - - $144 - - - - - -
-
kWh
-
-
MMBtu
$144
-
lb
-
-
lb
-
-
$
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$60
Cost:
-
- - - - - - $60 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$60
-
lb
-
-
$
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$15,000
Cost:
$4,272
- - - - - - - - $15,000 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
lb
$15,000
-
$
TOTAL RECOMMENDED Savings:
$21,985
Cost:
$9,341
$5,028 69,459 $673 86 $1,224 - $60 - $15,000 - $5,028
69,459
kWh
$673
86
MMBtu
$1,224
-
lb
$60
-
lb
$15,000
-
$
TOTAL IMPLEMENTED Savings:
$4,710
Cost:
$3,243
$4,566 62,426 - - $144 - - - - - $4,566
62,426
kWh
-
-
MMBtu
$144
-
lb
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes