IAC Assessment: WV0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Printing Publications
NAICS n/a
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 860
Plant Area (Sq.Ft.) 200,000
Annual Production 1,565,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,436,755 40,921,454 kWh $0.04
Electricity Demand $532,848 71,842 kW-months/year $7.42
Natural Gas $833,590 158,685 MMBtu $5.25
TOTAL ENERGY COSTS $2,803,193
RECOMMENDED SAVINGS* $547,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $167,803
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$279,346
Cost:
$353,018
$191,763 9,012,603 $87,583 11,932 - - - - - - - - - - $191,763
9,012,603
kWh
$87,583
11,932
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$24,920
Cost:
$76,400
$13,023 589,977 $11,897 1,621 - - - - - - - - - - $13,023
589,977
kWh
$11,897
1,621
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,228
Cost:
$9,955
$5,648 255,862 $2,580 351 - - - - - - - - - - $5,648
255,862
kWh
$2,580
351
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$47,889
Cost:
$2,760
$32,875 1,489,156 $15,014 2,045 - - - - - - - - - - $32,875
1,489,156
kWh
$15,014
2,045
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$3,319
Cost:
$36
$2,277 103,165 $1,042 142 - - - - - - - - - - $2,277
103,165
kWh
$1,042
142
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$536
Cost:
$108
$368 16,706 $168 23 - - - - - - - - - - $368
16,706
kWh
$168
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,825
Cost:
$54
$6,745 305,393 $3,080 419 - - - - - - - - - - $6,745
305,393
kWh
$3,080
419
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,703
Cost:
$924
$3,914 177,315 $1,789 244 - - - - - - - - - - $3,914
177,315
kWh
$1,789
244
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,111
Cost:
$3,360
- - - - $23,111 4,402 - - - - - - - - -
-
kWh
-
-
kW-months/year
$23,111
4,402
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$706
Cost:
$1,590
$706 31,946 - - - - - - - - - - - - $706
31,946
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,892
Cost:
$6,990
$7,479 338,804 $3,413 465 - - - - - - - - - - $7,479
338,804
kWh
$3,413
465
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
12: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$43,495
Cost:
$2,000
$29,858 1,352,579 $13,637 1,858 - - - - - - - - - - $29,858
1,352,579
kWh
$13,637
1,858
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,816
Cost:
$300
$1,036 46,893 $780 107 - - - - - - - - - - $1,036
46,893
kWh
$780
107
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
14: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,005
Cost:
$2,580
- - - - $4,005 763 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,005
763
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
15: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,841
Cost:
$10,820
$3,946 178,781 $2,895 394 - - - - - - - - - - $3,946
178,781
kWh
$2,895
394
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
16: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$24,641
Cost:
$1,440
$16,915 766,120 $7,726 1,052 - - - - - - - - - - $16,915
766,120
kWh
$7,726
1,052
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
17: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$397
Cost:
$1,444
$302 9,379 $95 13 - - - - - - - - - - $302
9,379
kWh
$95
13
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
18: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$80
Cost:
-
- - - - - - - - $80 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$80
-
lb
-
-
$
-
-
$
19: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$480
Cost:
$100
- - - - - - $480 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$480
-
lb
-
-
lb
-
-
$
-
-
$
20: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$18,100
Cost:
$4,320
- - - - - - $18,100 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,100
-
lb
-
-
lb
-
-
$
-
-
$
21: 3.4155 METER WASTE WATER Savings:
$13,220
Cost:
$1,200
- - - - - - - - - - $13,220 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$13,220
-
$
-
-
$
22: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$20,000
Cost:
$30,000
- - - - - - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
$20,000
-
$
TOTAL RECOMMENDED Savings:
$547,550
Cost:
$509,399
$316,855 14,674,679 $151,699 20,666 $27,116 5,165 $18,580 - $80 - $13,220 - $20,000 - $316,855
14,674,679
kWh
$151,699
20,666
kW-months/year
$27,116
5,165
MMBtu
$18,580
-
lb
$80
-
lb
$13,220
-
$
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$167,803
Cost:
$16,342
$90,376 4,089,391 $41,542 5,659 $4,005 763 $18,580 - $80 - $13,220 - - - $90,376
4,089,391
kWh
$41,542
5,659
kW-months/year
$4,005
763
MMBtu
$18,580
-
lb
$80
-
lb
$13,220
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product