Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2001 |
Principal Product | Industrial pipe fittings and valves |
NAICS | n/a |
SIC | 3462 - Iron And Steel Forgings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 154,000 |
Annual Production | 10,200,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $230,419 | 5,085,880 | kWh | $0.05 |
Electricity Demand | $135,730 | 12,870 | kW-months/year | $10.55 |
Natural Gas | $105,933 | 9,900 | MMBtu | $10.70 |
TOTAL ENERGY COSTS | $472,082 | |||
RECOMMENDED SAVINGS* | $117,097 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $93,777 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $16,581 Cost: $2,904 |
- | - | - | - | $16,581 | 1,396 | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,581 1,396 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $935 Cost: $100 |
$599 | 16,408 | $336 | 3 | - | - | - | - | - | - |
$599 16,408 kWh |
$336 3 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,296 Cost: $1,000 |
$3,161 | 76,473 | $3,135 | 25 | - | - | - | - | - | - |
$3,161 76,473 kWh |
$3,135 25 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,685 Cost: $880 |
$3,804 | 92,002 | $1,881 | 15 | - | - | - | - | - | - |
$3,804 92,002 kWh |
$1,881 15 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,036 Cost: $1,025 |
$497 | 12,013 | $539 | 4 | - | - | - | - | - | - |
$497 12,013 kWh |
$539 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $13,220 Cost: $1,792 |
$8,831 | 213,597 | $4,389 | 35 | - | - | - | - | - | - |
$8,831 213,597 kWh |
$4,389 35 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,470 Cost: $208 |
$981 | 23,733 | $489 | 4 | - | - | - | - | - | - |
$981 23,733 kWh |
$489 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,491 Cost: $44 |
$2,337 | 56,549 | $1,154 | 9 | - | - | - | - | - | - |
$2,337 56,549 kWh |
$1,154 9 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $2,857 Cost: $3,172 |
- | - | - | - | $2,857 | 267 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,857 267 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,376 Cost: $1,528 |
- | - | - | - | - | - | $1,376 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,376 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5318 RECYCLE FLUORESCENT LAMPS |
Savings: $3,390 Cost: $352 |
- | - | - | - | - | - | $3,390 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,390 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.125 |
Savings: $45,760 Cost: $5,000 |
- | - | - | - | - | - | - | - | $45,760 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$45,760 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $15,000 Cost: $332 |
- | - | - | - | - | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,097 Cost: $18,337 |
$20,210 | 490,775 | $11,923 | 95 | $19,438 | 1,663 | $4,766 | - | $60,760 | - | $20,210 490,775 kWh |
$11,923 95 kW-months/year |
$19,438 1,663 MMBtu |
$4,766 - gal |
$60,760 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $93,777 Cost: $9,500 |
$18,732 | 455,029 | $10,895 | 87 | - | - | $3,390 | - | $60,760 | - | $18,732 455,029 kWh |
$10,895 87 kW-months/year |
- - MMBtu |
$3,390 - gal |
$60,760 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes |