IAC logo
IAC Assessment: WV0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Lithographic sheets
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 176
Plant Area (Sq.Ft.) 158,000
Annual Production 115,000 Tons
Production Hrs. Annual 6,984
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,423 14,096,000 kWh $0.03
Electricity Demand $249,871 30,055 kW-months/year $8.31
Natural Gas $1,234,310 197,979 MMBtu $6.23
TOTAL ENERGY COSTS $1,878,604
RECOMMENDED SAVINGS* $196,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,919
Cost:
$750
$2,897 101,085 $2,022 18 - - - - - - - - $2,897
101,085
kWh
$2,022
18
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,589
Cost:
$1,980
$1,074 37,504 $515 5 - - - - - - - - $1,074
37,504
kWh
$515
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$913
Cost:
$100
$587 20,510 $326 3 - - - - - - - - $587
20,510
kWh
$326
3
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$704
Cost:
$50
$453 15,822 $251 2 - - - - - - - - $453
15,822
kWh
$251
2
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$603
Cost:
$390
$386 13,478 $217 2 - - - - - - - - $386
13,478
kWh
$217
2
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$275
Cost:
$112
- - - - $275 44 - - - - - - -
-
kWh
-
-
kW-months/year
$275
44
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$31,855
Cost:
$2,000
$21,552 751,545 $10,303 108 - - - - - - - - $21,552
751,545
kWh
$10,303
108
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,200
Cost:
$1,000
$7,820 273,076 $4,380 39 - - - - - - - - $7,820
273,076
kWh
$4,380
39
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,150
Cost:
$2,910
$663 23,147 $487 5 - - - - - - - - $663
23,147
kWh
$487
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,267
Cost:
$3,000
- - - - $16,267 2,611 - - - - - - -
-
kWh
-
-
kW-months/year
$16,267
2,611
MMBtu
-
-
gal
-
-
lb
-
-
$
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,814
Cost:
$100
$3,935 137,417 $1,879 20 - - - - - - - - $3,935
137,417
kWh
$1,879
20
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
12: 3.3111 ADJUST PH FOR NEUTRALIZATION Savings:
$8,625
Cost:
$13,725
- - - - - - $8,625 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,625
-
gal
-
-
lb
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,200
Cost:
$75
- - - - - - - - $1,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,200
-
lb
-
-
$
14: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$110,000
Cost:
$85,000
- - - - - - - - - - $110,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$110,000
-
$
TOTAL RECOMMENDED Savings:
$196,114
Cost:
$111,192
$39,367 1,373,584 $20,380 202 $16,542 2,655 $8,625 - $1,200 - $110,000 - $39,367
1,373,584
kWh
$20,380
202
kW-months/year
$16,542
2,655
MMBtu
$8,625
-
gal
$1,200
-
lb
$110,000
-
$
TOTAL IMPLEMENTED Savings:
$58,929
Cost:
$7,437
$37,840 1,320,258 $19,614 195 $275 44 - - $1,200 - - - $37,840
1,320,258
kWh
$19,614
195
kW-months/year
$275
44
MMBtu
-
-
gal
$1,200
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes