IAC Assessment: WV0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Metal can components
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 100,000
Annual Production 40,607,448 Pieces
Production Hrs. Annual 6,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,574 3,967,068 kWh $0.06
Natural Gas $331,074 47,897 MMBtu $6.91
TOTAL ENERGY COSTS $552,648
RECOMMENDED SAVINGS* $168,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,785
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ MMBtu $ gal $ $
01: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$221
Cost:
$130
$221 4,102 - - - - - - $221
4,102
kWh
-
-
MMBtu
-
-
gal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,117
Cost:
$720
$10,117 181,074 - - - - - - $10,117
181,074
kWh
-
-
MMBtu
-
-
gal
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$11,376
Cost:
$2,400
$11,376 203,635 - - - - - - $11,376
203,635
kWh
-
-
MMBtu
-
-
gal
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$187
Cost:
$98
- - $187 27 - - - - -
-
kWh
$187
27
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,326
Cost:
$1,245
$1,326 23,733 - - - - - - $1,326
23,733
kWh
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,801
Cost:
$60
$1,801 32,230 - - - - - - $1,801
32,230
kWh
-
-
MMBtu
-
-
gal
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$147
Cost:
$320
$147 2,637 - - - - - - $147
2,637
kWh
-
-
MMBtu
-
-
gal
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,128
Cost:
$1,200
$2,128 38,090 - - - - - - $2,128
38,090
kWh
-
-
MMBtu
-
-
gal
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$18,975
Cost:
$5,660
- - $18,975 2,746 - - - - -
-
kWh
$18,975
2,746
MMBtu
-
-
gal
-
-
$
10: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$318
Cost:
$953
- - $318 46 - - - - -
-
kWh
$318
46
MMBtu
-
-
gal
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$850
Cost:
$2,547
- - - - $850 - - - -
-
kWh
-
-
MMBtu
$850
-
gal
-
-
$
12: 3.3111 ADJUST PH FOR NEUTRALIZATION Savings:
$11,300
Cost:
$13,000
- - - - $11,300 - - - -
-
kWh
-
-
MMBtu
$11,300
-
gal
-
-
$
13: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$110,000
Cost:
$858,000
- - - - - - $110,000 - -
-
kWh
-
-
MMBtu
-
-
gal
$110,000
-
$
TOTAL RECOMMENDED Savings:
$168,746
Cost:
$886,333
$27,116 485,501 $19,480 2,819 $12,150 - $110,000 - $27,116
485,501
kWh
$19,480
2,819
MMBtu
$12,150
-
gal
$110,000
-
$
TOTAL IMPLEMENTED Savings:
$27,785
Cost:
$8,270
$26,748 478,762 $187 27 $850 - - - $26,748
478,762
kWh
$187
27
MMBtu
$850
-
gal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $
Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes