Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Automotive Seat Rows |
NAICS | n/a |
SIC | 2531 - Public Building & Related Furniture |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 274,575 Pieces |
Production Hrs. Annual | 4,165 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $137,587 | 2,817,000 | kWh | $0.05 |
Electricity Demand | $70,739 | 8,236 | kW-months/year | $8.59 |
Natural Gas | $27,725 | 2,075 | MMBtu | $13.36 |
TOTAL ENERGY COSTS | $236,051 | |||
RECOMMENDED SAVINGS* | $66,328 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,714 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $884 Cost: $150 |
$587 | 12,149 | $297 | 3 | - | - | - | - | - | - | - | - |
$587 12,149 kWh |
$297 3 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,821 Cost: $1,000 |
- | - | - | - | $3,821 | 286 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,821 286 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $2,127 Cost: $1,155 |
$1,412 | 28,922 | $715 | 7 | - | - | - | - | - | - | - | - |
$1,412 28,922 kWh |
$715 7 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $2,818 Cost: $300 |
$1,868 | 38,383 | $950 | 9 | - | - | - | - | - | - | - | - |
$1,868 38,383 kWh |
$950 9 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $706 Cost: $148 |
$481 | 9,845 | $225 | 2 | - | - | - | - | - | - | - | - |
$481 9,845 kWh |
$225 2 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $689 Cost: $20 |
$469 | 9,610 | $220 | 2 | - | - | - | - | - | - | - | - |
$469 9,610 kWh |
$220 2 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $907 Cost: $480 |
$515 | 10,554 | $392 | 4 | - | - | - | - | - | - | - | - |
$515 10,554 kWh |
$392 4 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $4,088 Cost: $2,680 |
- | - | - | - | $4,088 | 306 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,088 306 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $11,788 Cost: - |
$6,840 | 140,054 | $4,948 | 48 | - | - | - | - | - | - | - | - |
$6,840 140,054 kWh |
$4,948 48 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $1,421 Cost: - |
$268 | 5,482 | $1,153 | 11 | - | - | - | - | - | - | - | - |
$268 5,482 kWh |
$1,153 11 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,899 Cost: $1,270 |
- | - | - | - | $2,899 | 217 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,899 217 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $4,400 Cost: $1,930 |
- | - | - | - | - | - | $4,400 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,400 - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $16,400 Cost: $60 |
- | - | - | - | - | - | - | - | $16,400 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$16,400 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $4,680 Cost: $100 |
- | - | - | - | - | - | - | - | $4,680 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$4,680 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.125 |
Savings: $8,700 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | $8,700 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$8,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,328 Cost: $9,793 |
$12,440 | 254,999 | $8,900 | 86 | $10,808 | 809 | $4,400 | - | $21,080 | - | $8,700 | - | $12,440 254,999 kWh |
$8,900 86 kW-months/year |
$10,808 809 MMBtu |
$4,400 - gal |
$21,080 - lb |
$8,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,714 Cost: $2,265 |
$11,959 | 245,154 | $8,675 | 84 | - | - | - | - | $21,080 | - | - | - | $11,959 245,154 kWh |
$8,675 84 kW-months/year |
- - MMBtu |
- - gal |
$21,080 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |