Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Cans, Can Parts, Can Bodies |
NAICS | n/a |
SIC | 3411 - Metal Cans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 175,000 |
Annual Production | 120,000,000 Pieces |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $483,927 | 6,308,000 | kWh | $0.08 |
Natural Gas | $68,066 | 10,392 | MMBtu | $6.55 |
TOTAL ENERGY COSTS | $551,993 | |||
RECOMMENDED SAVINGS* | $66,581 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $15,241 Cost: $1,875 |
$15,241 | 198,651 | - | - | - | - | - | - |
$15,241 198,651 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $1,124 Cost: $525 |
$1,124 | 14,650 | - | - | - | - | - | - |
$1,124 14,650 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,006 Cost: $3,100 |
$5,006 | 65,251 | - | - | - | - | - | - |
$5,006 65,251 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $9,017 Cost: $750 |
$9,017 | 121,302 | - | - | - | - | - | - |
$9,017 121,302 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,013 Cost: $444 |
$5,013 | 65,412 | - | - | - | - | - | - |
$5,013 65,412 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,512 Cost: $125 |
$7,512 | 97,909 | - | - | - | - | - | - |
$7,512 97,909 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,700 Cost: $100 |
- | - | - | - | $2,700 | - | - | - |
- - kWh |
- - Tgal |
$2,700 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,968 Cost: $2,500 |
- | - | $6,968 | - | - | - | - | - |
- - kWh |
$6,968 - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $14,000 Cost: $6,000 |
- | - | - | - | - | - | $14,000 | - |
- - kWh |
- - Tgal |
- - lb |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,581 Cost: $15,419 |
$42,913 | 563,175 | $6,968 | - | $2,700 | - | $14,000 | - | $42,913 563,175 kWh |
$6,968 - Tgal |
$2,700 - lb |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,600 Cost: $6,475 |
$37,900 | 497,763 | - | - | $2,700 | - | - | - | $37,900 497,763 kWh |
- - Tgal |
$2,700 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Administrative Changes |