Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2003 |
Principal Product | Dried Lumber |
NAICS | 321999 - All Other Miscellaneous Wood Product Manufacturing |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | <$500,000 |
# of Employees | 8 |
Plant Area (Sq.Ft.) | 10,000 |
Annual Production | 4,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $26,362 | 362,631 | kWh | $0.07 |
Electricity Fees | $1,317 | - | $ | - |
Natural Gas | $80,174 | 9,993 | MMBtu | $8.02 |
TOTAL ENERGY COSTS | $107,853 | |||
RECOMMENDED SAVINGS* | $69,131 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,755 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $52,226 Cost: $153,000 |
- | - | - | - | - | - | $52,226 | - |
- - kWh |
- - MMBtu |
- - $ |
$52,226 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $12,150 Cost: $1,695 |
- | - | $12,150 | 1,515 | - | - | - | - |
- - kWh |
$12,150 1,515 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,940 Cost: $240 |
$1,990 | 26,077 | - | - | $(-50) | - | - | - |
$1,990 26,077 kWh |
- - MMBtu |
$(-50) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,652 Cost: $1,000 |
- | - | $1,652 | 206 | - | - | - | - |
- - kWh |
$1,652 206 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,163 Cost: $38 |
- | - | $1,163 | 145 | - | - | - | - |
- - kWh |
$1,163 145 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $69,131 Cost: $155,973 |
$1,990 | 26,077 | $14,965 | 1,866 | $(-50) | - | $52,226 | - | $1,990 26,077 kWh |
$14,965 1,866 MMBtu |
$(-50) - $ |
$52,226 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,755 Cost: $1,278 |
$1,990 | 26,077 | $2,815 | 351 | $(-50) | - | - | - | $1,990 26,077 kWh |
$2,815 351 MMBtu |
$(-50) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes |