IAC Assessment: WV0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2004
Principal Product Fiberglass Reinforced Plastic
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 395
Plant Area (Sq.Ft.) 293,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,958 19,086,621 kWh $0.03
Electricity Demand $307,850 39,468 kW-months/year $7.80
Electricity Fees $69,398 - $ -
Natural Gas $1,004,952 152,614 MMBtu $6.58
TOTAL ENERGY COSTS $1,941,158
RECOMMENDED SAVINGS* $267,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $139,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$27,182
Cost:
$23,577
- - - - $27,182 4,131 - - -
-
kWh
-
-
kW-months/year
$27,182
4,131
MMBtu
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$20,348
Cost:
-
$14,397 436,863 $6,815 874 - - $(-864) - $14,397
436,863
kWh
$6,815
874
kW-months/year
-
-
MMBtu
$(-864)
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,410
Cost:
$20,490
$19,410 - - - - - - - $19,410
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$20,214
Cost:
$5,139
- - - - $20,214 3,072 - - -
-
kWh
-
-
kW-months/year
$20,214
3,072
MMBtu
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$12,831
Cost:
$800
- - - - $12,831 1,950 - - -
-
kWh
-
-
kW-months/year
$12,831
1,950
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,831
Cost:
$488
- - - - $11,831 1,798 - - -
-
kWh
-
-
kW-months/year
$11,831
1,798
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,318
Cost:
$16,842
$8,936 271,258 $382 49 - - - - $8,936
271,258
kWh
$382
49
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,268
Cost:
$3,720
$(-681) (-14,064) - - $8,949 1,360 - - $(-681)
(-14,064)
kWh
-
-
kW-months/year
$8,949
1,360
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,017
Cost:
$21,962
$4,771 144,854 $2,246 288 - - - - $4,771
144,854
kWh
$2,246
288
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$40,944
Cost:
$1,000
- - - - $50,160 7,623 $(-9,216) - -
-
kWh
-
-
kW-months/year
$50,160
7,623
MMBtu
$(-9,216)
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,074
Cost:
-
$6,140 186,516 $1,934 248 - - - - $6,140
186,516
kWh
$1,934
248
kW-months/year
-
-
MMBtu
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,851
Cost:
$528
$3,977 120,448 $1,874 240 - - - - $3,977
120,448
kWh
$1,874
240
kW-months/year
-
-
MMBtu
-
-
$
13: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,626
Cost:
$750
- - - - $3,626 551 - - -
-
kWh
-
-
kW-months/year
$3,626
551
MMBtu
-
-
$
14: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,330
Cost:
$420
$1,581 48,195 $749 96 - - - - $1,581
48,195
kWh
$749
96
kW-months/year
-
-
MMBtu
-
-
$
15: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,326
Cost:
$1,048
$897 27,335 $429 55 - - - - $897
27,335
kWh
$429
55
kW-months/year
-
-
MMBtu
-
-
$
16: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,014
Cost:
$100
$688 20,903 $326 42 - - - - $688
20,903
kWh
$326
42
kW-months/year
-
-
MMBtu
-
-
$
17: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$841
Cost:
$840
$560 17,098 $281 36 - - - - $560
17,098
kWh
$281
36
kW-months/year
-
-
MMBtu
-
-
$
18: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$665
Cost:
$1,296
$492 14,943 $173 22 - - - - $492
14,943
kWh
$173
22
kW-months/year
-
-
MMBtu
-
-
$
19: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$625
Cost:
$30
- - - - $625 95 - - -
-
kWh
-
-
kW-months/year
$625
95
MMBtu
-
-
$
20: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,866
Cost:
$8,560
$11,445 347,601 $5,421 695 - - - - $11,445
347,601
kWh
$5,421
695
kW-months/year
-
-
MMBtu
-
-
$
21: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$13,489
Cost:
$4,460
- - - - $13,489 2,050 - - -
-
kWh
-
-
kW-months/year
$13,489
2,050
MMBtu
-
-
$
22: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$8,249
Cost:
$1,200
$5,597 170,088 $2,652 340 - - - - $5,597
170,088
kWh
$2,652
340
kW-months/year
-
-
MMBtu
-
-
$
23: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,043
Cost:
$459
$4,101 124,525 $1,942 249 - - - - $4,101
124,525
kWh
$1,942
249
kW-months/year
-
-
MMBtu
-
-
$
24: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,935
Cost:
$5,740
$4,024 122,275 $1,911 245 - - - - $4,024
122,275
kWh
$1,911
245
kW-months/year
-
-
MMBtu
-
-
$
25: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$5,929
Cost:
$3,460
- - - - $5,929 901 - - -
-
kWh
-
-
kW-months/year
$5,929
901
MMBtu
-
-
$
26: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,494
Cost:
$4,715
$3,050 92,617 $1,444 185 - - - - $3,050
92,617
kWh
$1,444
185
kW-months/year
-
-
MMBtu
-
-
$
27: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,007
Cost:
$1,000
- - - - $2,007 305 - - -
-
kWh
-
-
kW-months/year
$2,007
305
MMBtu
-
-
$
28: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$1,659
Cost:
$2,088
$1,129 34,281 $530 68 - - - - $1,129
34,281
kWh
$530
68
kW-months/year
-
-
MMBtu
-
-
$
29: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,497
Cost:
$1,944
$1,013 30,769 $484 63 - - - - $1,013
30,769
kWh
$484
63
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$267,883
Cost:
$132,656
$91,527 2,196,505 $29,593 3,795 $156,843 23,836 $(-10,080) - $91,527
2,196,505
kWh
$29,593
3,795
kW-months/year
$156,843
23,836
MMBtu
$(-10,080)
-
$
TOTAL IMPLEMENTED Savings:
$139,742
Cost:
$36,008
$36,887 1,120,063 $16,504 2,116 $96,431 14,655 $(-10,080) - $36,887
1,120,063
kWh
$16,504
2,116
kW-months/year
$96,431
14,655
MMBtu
$(-10,080)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes