IAC logo
IAC Assessment: WV0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2004
Principal Product Carded Packaging
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 185,000
Annual Production 15,000 Tons
Production Hrs. Annual 6,552
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,008 4,337,280 kWh $0.05
Electricity Demand $83,014 14,318 kW-months/year $5.80
Natural Gas $21,605 2,929 MMBtu $7.38
TOTAL ENERGY COSTS $321,627
RECOMMENDED SAVINGS* $567,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,792
Cost:
$30,627
$30,258 604,799 $534 92 - - $30,258
604,799
kWh
$534
92
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,219
Cost:
$4,900
$8,430 168,350 $1,789 26 - - $8,430
168,350
kWh
$1,789
26
kW-months/year
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,704
Cost:
$230
$4,706 94,053 $998 172 - - $4,706
94,053
kWh
$998
172
kW-months/year
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,247
Cost:
$2,660
$3,841 76,712 $406 70 - - $3,841
76,712
kWh
$406
70
kW-months/year
-
-
$
05: 4.623 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$509,116
Cost:
$20,000
$2,668 53,228 - - $506,448 - $2,668
53,228
kWh
-
-
kW-months/year
$506,448
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,472
Cost:
$920
$2,039 40,758 $433 75 - - $2,039
40,758
kWh
$433
75
kW-months/year
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,431
Cost:
$784
$2,008 40,141 $423 73 - - $2,008
40,141
kWh
$423
73
kW-months/year
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,317
Cost:
$215
$1,085 21,751 $232 40 - - $1,085
21,751
kWh
$232
40
kW-months/year
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$609
Cost:
$46
$400 7,992 $209 3 - - $400
7,992
kWh
$209
3
kW-months/year
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$232
Cost:
$129
$190 3,974 $42 7 - - $190
3,974
kWh
$42
7
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$567,139
Cost:
$60,511
$55,625 1,111,758 $5,066 557 $506,448 - $55,625
1,111,758
kWh
$5,066
557
kW-months/year
$506,448
-
$
TOTAL IMPLEMENTED Savings:
$16,780
Cost:
$4,855
$14,079 281,407 $2,701 433 - - $14,079
281,407
kWh
$2,701
433
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product