Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2004
Principal Product Frozen Dough Products
NAICS 311824 - Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2045 - Prepared Flour Mixes And Doughs
Sales $10,000,000-$50,000,000
# of Employees 184
Plant Area (Sq.Ft.) 86,700
Annual Production 157,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $397,604 19,984,034 kWh $0.02
Electricity Demand $215,063 38,750 kW-months/year $5.55
Electricity Fees $225,561 - $ -
Natural Gas $115,562 14,384 MMBtu $8.03
Fuel Oil #2 $20,475 2,365 MMBtu $8.66
TOTAL ENERGY COSTS $974,265
RECOMMENDED SAVINGS* $79,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,966
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$30,817
Cost:
$4,062
$24,779 794,323 $6,038 1,088 - - - - - - $24,779
794,323
kWh
$6,038
1,088
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,918
Cost:
$4,120
- - - - $15,918 1,960 - - - - -
-
kWh
-
-
kW-months/year
$15,918
1,960
MMBtu
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,529
Cost:
$14,877
$5,703 182,772 $1,826 329 - - - - - - $5,703
182,772
kWh
$1,826
329
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$6,476
Cost:
$360
$5,271 169,061 $1,565 282 - - - - $(-360) - $5,271
169,061
kWh
$1,565
282
kW-months/year
-
-
MMBtu
-
-
gal
$(-360)
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,088
Cost:
$1,890
$3,044 97,569 $1,044 188 - - - - - - $3,044
97,569
kWh
$1,044
188
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,898
Cost:
$780
- - - - $3,898 480 - - - - -
-
kWh
-
-
kW-months/year
$3,898
480
MMBtu
-
-
gal
-
-
$
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$3,558
Cost:
$1,000
- - - - $4,638 571 - - $(-1,080) - -
-
kWh
-
-
kW-months/year
$4,638
571
MMBtu
-
-
gal
$(-1,080)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,925
Cost:
$120
$2,257 72,371 $668 10 - - - - - - $2,257
72,371
kWh
$668
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
09: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,799
Cost:
$3,800
- - - - $1,624 200 $175 - - - -
-
kWh
-
-
kW-months/year
$1,624
200
MMBtu
$175
-
gal
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,362
Cost:
$175
$1,051 33,839 $311 56 - - - - - - $1,051
33,839
kWh
$311
56
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,293
Cost:
-
$1,005 32,314 $288 52 - - - - - - $1,005
32,314
kWh
$288
52
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$317
Cost:
$117
- - - - $317 39 - - - - -
-
kWh
-
-
kW-months/year
$317
39
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$79,980
Cost:
$31,301
$43,110 1,382,249 $11,740 2,005 $26,395 3,250 $175 - $(-1,440) - $43,110
1,382,249
kWh
$11,740
2,005
kW-months/year
$26,395
3,250
MMBtu
$175
-
gal
$(-1,440)
-
$
TOTAL IMPLEMENTED Savings:
$73,966
Cost:
$26,604
$43,110 1,382,249 $11,740 2,005 $20,556 2,531 - - $(-1,440) - $43,110
1,382,249
kWh
$11,740
2,005
kW-months/year
$20,556
2,531
MMBtu
-
-
gal
$(-1,440)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes