Assessment Year | 2004 |
Principal Product | Fluid Milk |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 3,000 Thousand Gallons |
Production Hrs. Annual | 4,030 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $116,139 | 1,148,760 | kWh | $0.10 |
Electricity Fees | $(-248) | - | $ | - |
Natural Gas | $53,456 | 5,744 | MMBtu | $9.31 |
TOTAL ENERGY COSTS | $169,347 | |||
RECOMMENDED SAVINGS* | $40,223 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,108 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,997 Cost: $96 |
$6,997 | 69,353 | - | - | - | - |
$6,997 69,353 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $6,442 Cost: $1,774 |
$6,442 | 63,874 | - | - | - | - |
$6,442 63,874 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,562 Cost: $221 |
$6,562 | 64,938 | - | - | - | - |
$6,562 64,938 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,370 Cost: $6,052 |
$3,370 | 33,526 | - | - | - | - |
$3,370 33,526 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,922 Cost: $1,000 |
- | - | $2,951 | 317 | $(-29) | - |
- - kWh |
$2,951 317 MMBtu |
$(-29) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $2,458 Cost: $337 |
- | - | $2,458 | 264 | - | - |
- - kWh |
$2,458 264 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $2,040 Cost: $1,870 |
- | - | $2,040 | 219 | - | - |
- - kWh |
$2,040 219 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,997 Cost: $472 |
$591 | 5,860 | $1,406 | 151 | - | - |
$591 5,860 kWh |
$1,406 151 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,769 Cost: $1,711 |
- | - | $1,769 | 190 | - | - |
- - kWh |
$1,769 190 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,554 Cost: - |
$1,554 | 15,418 | - | - | - | - |
$1,554 15,418 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,275 Cost: $591 |
- | - | $1,275 | 137 | - | - |
- - kWh |
$1,275 137 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $964 Cost: $416 |
$964 | 9,552 | - | - | - | - |
$964 9,552 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $532 Cost: $326 |
$532 | 5,274 | - | - | - | - |
$532 5,274 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $543 Cost: $174 |
$891 | 8,790 | - | - | $(-348) | - |
$891 8,790 kWh |
- - MMBtu |
$(-348) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $443 Cost: $80 |
$443 | 4,368 | - | - | - | - |
$443 4,368 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $355 Cost: $370 |
$355 | 3,602 | - | - | - | - |
$355 3,602 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,223 Cost: $15,490 |
$28,701 | 284,555 | $11,899 | 1,278 | $(-377) | - | $28,701 284,555 kWh |
$11,899 1,278 MMBtu |
$(-377) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,108 Cost: $12,761 |
$18,761 | 185,954 | $8,724 | 937 | $(-377) | - | $18,761 185,954 kWh |
$8,724 937 MMBtu |
$(-377) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |