Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2005 |
Principal Product | Plastic Moldings |
NAICS | 326121 - Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3082 - Unsupported Plastics Profile Shapes |
Sales | $5,000,000-$10,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 106,000 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $70,454 | 1,433,222 | kWh | $0.05 |
Electricity Demand | $41,091 | 4,702 | kW-months/year | $8.74 |
Electricity Fees | $(-4,796) | - | $ | - |
Natural Gas | $7,199 | 827 | MMBtu | $8.70 |
TOTAL ENERGY COSTS | $145,913 | |||
RECOMMENDED SAVINGS* | $41,117 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,209 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,618 Cost: $1,147 |
$6,999 | 152,799 | $2,619 | 300 | - | - | - | - | - | - | - | - |
$6,999 152,799 kWh |
$2,619 300 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $3,338 Cost: $550 |
$2,429 | 53,165 | $909 | 104 | - | - | - | - | - | - | - | - |
$2,429 53,165 kWh |
$909 104 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,461 Cost: $760 |
$1,704 | 37,211 | $757 | 87 | - | - | - | - | - | - | - | - |
$1,704 37,211 kWh |
$757 87 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,239 Cost: $8,590 |
$1,510 | 32,971 | $729 | 83 | - | - | - | - | - | - | - | - |
$1,510 32,971 kWh |
$729 83 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,140 Cost: $98 |
$1,557 | 33,996 | $583 | 67 | - | - | - | - | - | - | - | - |
$1,557 33,996 kWh |
$583 67 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,646 Cost: $232 |
- | - | - | - | $1,646 | 189 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,646 189 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,551 Cost: $19 |
$1,129 | 24,632 | $422 | 48 | - | - | - | - | - | - | - | - |
$1,129 24,632 kWh |
$422 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,334 Cost: $1,436 |
$962 | 21,000 | $372 | 43 | - | - | - | - | - | - | - | - |
$962 21,000 kWh |
$372 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,138 Cost: - |
$588 | 12,837 | $550 | 63 | - | - | - | - | - | - | - | - |
$588 12,837 kWh |
$550 63 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,066 Cost: $507 |
$778 | 16,994 | $288 | 33 | - | - | - | - | - | - | - | - |
$778 16,994 kWh |
$288 33 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,012 Cost: $133 |
$1,066 | 23,440 | $402 | 46 | - | - | - | - | $(-456) | - | - | - |
$1,066 23,440 kWh |
$402 46 kW-months/year |
- - MMBtu |
- - Tgal |
$(-456) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $512 Cost: $480 |
$373 | 8,124 | $139 | 16 | - | - | - | - | - | - | - | - |
$373 8,124 kWh |
$139 16 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $374 Cost: - |
$272 | 5,924 | $102 | 12 | - | - | - | - | - | - | - | - |
$272 5,924 kWh |
$102 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $12,688 Cost: $5,135 |
$(-1,007) | (-21,975) | $(-375) | (-43) | - | - | $8,819 | 3,366,000 | - | - | $5,251 | - |
$(-1,007) (-21,975) kWh |
$(-375) (-43) kW-months/year |
- - MMBtu |
$8,819 3,366,000 Tgal |
- - $ |
$5,251 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,117 Cost: $19,087 |
$18,360 | 401,118 | $7,497 | 859 | $1,646 | 189 | $8,819 | 3,366,000 | $(-456) | - | $5,251 | - | $18,360 401,118 kWh |
$7,497 859 kW-months/year |
$1,646 189 MMBtu |
$8,819 3,366,000 Tgal |
$(-456) - $ |
$5,251 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,209 Cost: $12,036 |
$17,760 | 388,045 | $7,259 | 831 | $1,646 | 189 | - | - | $(-456) | - | - | - | $17,760 388,045 kWh |
$7,259 831 kW-months/year |
$1,646 189 MMBtu |
- - Tgal |
$(-456) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption |