Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2005 |
Principal Product | Coupling of Motors and Other Equipment |
NAICS | 332919 - Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3568 - Power Transmission Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 2,600,000 Pieces |
Production Hrs. Annual | 6,656 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $121,166 | 3,036,717 | kWh | $0.04 |
Electricity Demand | $65,945 | 6,434 | kW-months/year | $10.25 |
Electricity Fees | $8,362 | - | $ | - |
Natural Gas | $54,104 | 6,959 | MMBtu | $7.77 |
TOTAL ENERGY COSTS | $249,577 | |||
RECOMMENDED SAVINGS* | $39,500 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,059 Cost: $8,260 |
$9,810 | 229,935 | $4,249 | 415 | - | - | - | - | - | - |
$9,810 229,935 kWh |
$4,249 415 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,573 Cost: $8,352 |
$(-635) | (-14,896) | $(-550) | (-54) | - | - | $7,758 | 999 | - | - |
$(-635) (-14,896) kWh |
$(-550) (-54) kW-months/year |
- - $ |
$7,758 999 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,268 Cost: - |
$2,976 | 69,536 | $1,292 | 126 | - | - | - | - | - | - |
$2,976 69,536 kWh |
$1,292 126 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,968 Cost: $11,900 |
$2,456 | 57,574 | $1,512 | 147 | - | - | - | - | - | - |
$2,456 57,574 kWh |
$1,512 147 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,190 Cost: $820 |
- | - | - | - | $2,190 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,190 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,229 Cost: $304 |
$1,663 | 38,969 | $718 | 70 | - | - | - | - | $(-1,152) | - |
$1,663 38,969 kWh |
$718 70 kW-months/year |
- - $ |
- - MMBtu |
$(-1,152) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,763 Cost: $336 |
$1,230 | 28,829 | $533 | 52 | - | - | - | - | - | - |
$1,230 28,829 kWh |
$533 52 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,536 Cost: $870 |
$1,075 | 25,198 | $461 | 45 | - | - | - | - | - | - |
$1,075 25,198 kWh |
$461 45 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $951 Cost: $238 |
$664 | 15,540 | $287 | 28 | - | - | - | - | - | - |
$664 15,540 kWh |
$287 28 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $943 Cost: $24 |
$658 | 15,423 | $285 | 28 | - | - | - | - | - | - |
$658 15,423 kWh |
$285 28 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $921 Cost: $2,268 |
$616 | 14,444 | $305 | 30 | - | - | - | - | - | - |
$616 14,444 kWh |
$305 30 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $560 Cost: $145 |
- | - | - | - | - | - | $560 | 72 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$560 72 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $539 Cost: $132 |
$376 | 8,817 | $163 | 16 | - | - | - | - | - | - |
$376 8,817 kWh |
$163 16 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,500 Cost: $33,649 |
$20,889 | 489,369 | $9,255 | 903 | $2,190 | - | $8,318 | 1,071 | $(-1,152) | - | $20,889 489,369 kWh |
$9,255 903 kW-months/year |
$2,190 - $ |
$8,318 1,071 MMBtu |
$(-1,152) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes |