IAC logo
IAC Assessment: WV0330
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0330
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2005
Principal Product High Voltage Circuit Breaker
NAICS 335932 - Noncurrent-Carrying Wiring Device Manufacturing
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $100,000,000-$500,000,000
# of Employees 246
Plant Area (Sq.Ft.) 130,000
Annual Production 37,440 Pieces
Production Hrs. Annual 7,488
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,353 2,815,200 kWh $0.04
Electricity Demand $30,941 6,030 kW-months/year $5.13
Electricity Fees $8,366 - $ -
Natural Gas $22,122 139 MMBtu $159.15
TOTAL ENERGY COSTS $169,782
RECOMMENDED SAVINGS* $22,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,402
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,602
Cost:
-
- - - - - - $14,602 - -
-
kWh
-
-
kW-months/year
-
-
$
$14,602
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,316
Cost:
$1,325
$3,316 86,112 - - - - - - $3,316
86,112
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,364
Cost:
$3,679
$948 24,525 $416 81 - - - - $948
24,525
kWh
$416
81
kW-months/year
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,049
Cost:
$35
$1,049 27,249 - - - - - - $1,049
27,249
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$789
Cost:
$6
$666 17,403 $123 24 - - - - $666
17,403
kWh
$123
24
kW-months/year
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$508
Cost:
$105
$508 13,209 - - - - - - $508
13,209
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$474
Cost:
$140
$474 12,306 - - - - - - $474
12,306
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$138
Cost:
$95
$147 3,921 $26 5 $(-35) - - - $147
3,921
kWh
$26
5
kW-months/year
$(-35)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,240
Cost:
$5,385
$7,108 184,725 $565 110 $(-35) - $14,602 - $7,108
184,725
kWh
$565
110
kW-months/year
$(-35)
-
$
$14,602
-
$
TOTAL IMPLEMENTED Savings:
$20,402
Cost:
$1,566
$5,686 147,894 $149 29 $(-35) - $14,602 - $5,686
147,894
kWh
$149
29
kW-months/year
$(-35)
-
$
$14,602
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes