IAC Assessment: WV0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2006
Principal Product Hardwood Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 22,500
Annual Production 25,000,000 Units
Production Hrs. Annual 5,062
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,224 4,692,600 kWh $0.02
Electricity Demand $104,696 11,643 kW-months/year $8.99
TOTAL ENERGY COSTS $195,920
RECOMMENDED SAVINGS* $33,965 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,174
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$23,934
Cost:
$19,500
$8,296 410,022 $8,738 972 $(-300) - $7,200 - $8,296
410,022
kWh
$8,738
972
kW-months/year
$(-300)
-
$
$7,200
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,663
Cost:
$195
$2,295 113,287 $2,418 269 $(-50) - - - $2,295
113,287
kWh
$2,418
269
kW-months/year
$(-50)
-
$
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,692
Cost:
$544
$1,604 79,110 $1,688 188 $(-600) - - - $1,604
79,110
kWh
$1,688
188
kW-months/year
$(-600)
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,819
Cost:
$800
$884 43,657 $935 104 - - - - $884
43,657
kWh
$935
104
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$397
Cost:
$210
$397 19,626 - - - - - - $397
19,626
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$460
Cost:
-
$226 11,176 $234 26 - - - - $226
11,176
kWh
$234
26
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,965
Cost:
$21,249
$13,702 676,878 $14,013 1,559 $(-950) - $7,200 - $13,702
676,878
kWh
$14,013
1,559
kW-months/year
$(-950)
-
$
$7,200
-
$
TOTAL IMPLEMENTED Savings:
$9,174
Cost:
$1,539
$4,783 236,054 $5,041 561 $(-650) - - - $4,783
236,054
kWh
$5,041
561
kW-months/year
$(-650)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost