Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2006 |
Principal Product | Customized Injection Molded Plastics |
NAICS | 333511 - Industrial Mold Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 7,600,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $471,424 | 8,873,100 | kWh | $0.05 |
Electricity Demand | $111,945 | 17,322 | kW-months/year | $6.46 |
Electricity Fees | $32,322 | - | $ | - |
Natural Gas | $12,725 | 1,099 | MMBtu | $11.58 |
TOTAL ENERGY COSTS | $628,416 | |||
RECOMMENDED SAVINGS* | $96,481 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $88,616 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $64,554 Cost: $123,600 |
$52,584 | 926,532 | $11,970 | 1,853 | - | - | - | - |
$52,584 926,532 kWh |
$11,970 1,853 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,455 Cost: $800 |
$5,455 | 96,000 | - | - | - | - | - | - |
$5,455 96,000 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,170 Cost: $2,156 |
$3,975 | 70,027 | $1,195 | 185 | - | - | - | - |
$3,975 70,027 kWh |
$1,195 185 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,690 Cost: - |
$3,824 | 67,344 | $866 | 134 | - | - | - | - |
$3,824 67,344 kWh |
$866 134 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $3,170 Cost: $2,350 |
- | - | - | - | $3,170 | 274 | - | - |
- - kWh |
- - kW-months/year |
$3,170 274 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,233 Cost: $760 |
$2,601 | 45,708 | $592 | 92 | - | - | $(-960) | - |
$2,601 45,708 kWh |
$592 92 kW-months/year |
- - MMBtu |
$(-960) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,082 Cost: $590 |
$1,696 | 29,886 | $386 | 60 | - | - | - | - |
$1,696 29,886 kWh |
$386 60 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,981 Cost: $80 |
$1,613 | 28,354 | $368 | 57 | - | - | - | - |
$1,613 28,354 kWh |
$368 57 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,846 Cost: $2,185 |
$1,846 | 32,535 | - | - | - | - | - | - |
$1,846 32,535 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,777 Cost: - |
$1,480 | 26,077 | $337 | 52 | - | - | $(-40) | - |
$1,480 26,077 kWh |
$337 52 kW-months/year |
- - MMBtu |
$(-40) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,749 Cost: $2,400 |
$1,264 | 22,268 | $485 | 75 | - | - | - | - |
$1,264 22,268 kWh |
$485 75 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $1,100 Cost: $1,308 |
$896 | 15,784 | $204 | 32 | - | - | - | - |
$896 15,784 kWh |
$204 32 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $674 Cost: $1,280 |
$615 | 10,787 | $139 | 22 | - | - | $(-80) | - |
$615 10,787 kWh |
$139 22 kW-months/year |
- - MMBtu |
$(-80) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,481 Cost: $137,509 |
$77,849 | 1,371,302 | $16,542 | 2,562 | $3,170 | 274 | $(-1,080) | - | $77,849 1,371,302 kWh |
$16,542 2,562 kW-months/year |
$3,170 274 MMBtu |
$(-1,080) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $88,616 Cost: $129,266 |
$73,843 | 1,300,715 | $15,853 | 2,455 | - | - | $(-1,080) | - | $73,843 1,300,715 kWh |
$15,853 2,455 kW-months/year |
- - MMBtu |
$(-1,080) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |