Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2006 |
Principal Product | olefin foams polypropylene and polyethylene |
NAICS | 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 128,000 |
Annual Production | 3,264 Tons |
Production Hrs. Annual | 8,568 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $433,048 | 16,503,374 | kWh | $0.03 |
Electricity Demand | $216,006 | 28,883 | kW-months/year | $7.48 |
Electricity Fees | $28,883 | - | $ | - |
Natural Gas | $1,232,952 | 134,217 | MMBtu | $9.19 |
TOTAL ENERGY COSTS | $1,910,889 | |||
RECOMMENDED SAVINGS* | $164,193 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $145,210 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $80,134 Cost: $2,500 |
- | - | - | - | $81,754 | 8 | $(-1,620) | - |
- - kWh |
- - kW-months/year |
$81,754 8 MMBtu |
$(-1,620) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $42,375 Cost: $27,500 |
- | - | - | - | $42,375 | 4,611 | - | - |
- - kWh |
- - kW-months/year |
$42,375 4,611 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,539 Cost: $29,343 |
$7,659 | 273,592 | $2,880 | 383 | - | - | - | - |
$7,659 273,592 kWh |
$2,880 383 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,729 Cost: $2,605 |
$999 | 35,702 | $376 | 50 | $7,354 | 800 | - | - |
$999 35,702 kWh |
$376 50 kW-months/year |
$7,354 800 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,797 Cost: $1,520 |
- | - | - | - | $4,797 | 522 | - | - |
- - kWh |
- - kW-months/year |
$4,797 522 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $3,647 Cost: $6,520 |
$2,624 | 93,760 | $1,023 | 136 | - | - | - | - |
$2,624 93,760 kWh |
$1,023 136 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $3,001 Cost: $90 |
$2,181 | 77,938 | $820 | 109 | - | - | - | - |
$2,181 77,938 kWh |
$820 109 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $2,647 Cost: $1,000 |
$2,348 | 83,798 | $884 | 117 | - | - | $(-585) | - |
$2,348 83,798 kWh |
$884 117 kW-months/year |
- - MMBtu |
$(-585) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,384 Cost: $800 |
$1,730 | 61,821 | $654 | 87 | - | - | - | - |
$1,730 61,821 kWh |
$654 87 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,262 Cost: - |
$1,645 | 58,893 | $617 | 82 | - | - | - | - |
$1,645 58,893 kWh |
$617 82 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,152 Cost: $439 |
$2,348 | 83,798 | $884 | 117 | - | - | $(-1,080) | - |
$2,348 83,798 kWh |
$884 117 kW-months/year |
- - MMBtu |
$(-1,080) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $928 Cost: $1,270 |
$672 | 24,108 | $256 | 34 | - | - | - | - |
$672 24,108 kWh |
$256 34 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $598 Cost: $1,170 |
$500 | 17,897 | $188 | 25 | - | - | $(-90) | - |
$500 17,897 kWh |
$188 25 kW-months/year |
- - MMBtu |
$(-90) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $164,193 Cost: $74,757 |
$22,706 | 811,307 | $8,582 | 1,140 | $136,280 | 5,941 | $(-3,375) | - | $22,706 811,307 kWh |
$8,582 1,140 kW-months/year |
$136,280 5,941 MMBtu |
$(-3,375) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $145,210 Cost: $37,374 |
$12,423 | 443,955 | $4,679 | 621 | $131,483 | 5,419 | $(-3,375) | - | $12,423 443,955 kWh |
$4,679 621 kW-months/year |
$131,483 5,419 MMBtu |
$(-3,375) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |