IAC logo
IAC Assessment: WV0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2006
Principal Product chemicals for the oil and natural gas drilling industry
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 100,400
Annual Production 22,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,842 1,283,073 kWh $0.07
Natural Gas $130,136 9,538 MMBtu $13.64
TOTAL ENERGY COSTS $219,978
RECOMMENDED SAVINGS* $35,304 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,380
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$12,230
Cost:
$1,143
$12,230 174 - - - - $12,230
174
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,998
Cost:
$13,688
$9,998 142,758 - - - - $9,998
142,758
kWh
-
-
MMBtu
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,996
Cost:
$8,800
- - $4,996 366 - - -
-
kWh
$4,996
366
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,442
Cost:
$4,540
$2,442 34,867 - - - - $2,442
34,867
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,952
Cost:
$656
- - $1,952 143 - - -
-
kWh
$1,952
143
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,502
Cost:
$737
- - $1,502 110 - - -
-
kWh
$1,502
110
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$850
Cost:
$230
$1,498 21,389 - - $(-648) - $1,498
21,389
kWh
-
-
MMBtu
$(-648)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$800
Cost:
$14
$800 11,347 - - - - $800
11,347
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$534
Cost:
$131
$534 7,576 - - - - $534
7,576
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,304
Cost:
$29,939
$27,502 218,111 $8,450 619 $(-648) - $27,502
218,111
kWh
$8,450
619
MMBtu
$(-648)
-
$
TOTAL IMPLEMENTED Savings:
$25,380
Cost:
$15,812
$24,526 175,668 $1,502 110 $(-648) - $24,526
175,668
kWh
$1,502
110
MMBtu
$(-648)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes