IAC Assessment: WV0357
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0357
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2007
Principal Product contract injection molded components
NAICS 333511 - Industrial Mold Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 51
Plant Area (Sq.Ft.) 37,500
Annual Production 1,800,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $207,756 2,354,080 kWh $0.09
Natural Gas $10,369 731 MMBtu $14.18
TOTAL ENERGY COSTS $218,125
RECOMMENDED SAVINGS* $39,328 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,814
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,751
Cost:
$30,100
$15,751 178,480 - - $15,751
178,480
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,371
Cost:
$12,336
$5,371 60,857 - - $5,371
60,857
kWh
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,383
Cost:
$1,405
$4,383 49,810 - - $4,383
49,810
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,910
Cost:
$2,990
$2,910 32,978 - - $2,910
32,978
kWh
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,672
Cost:
$5,600
$2,672 30,272 - - $2,672
30,272
kWh
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,725
Cost:
$625
$1,725 19,546 - - $1,725
19,546
kWh
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,629
Cost:
$1,601
$1,629 18,459 - - $1,629
18,459
kWh
-
-
$
08: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,455
Cost:
$2,800
$1,455 16,481 - - $1,455
16,481
kWh
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,019
Cost:
$175
$1,319 14,943 $(-300) - $1,319
14,943
kWh
$(-300)
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$656
Cost:
$130
$656 7,430 - - $656
7,430
kWh
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$630
Cost:
-
$630 7,176 - - $630
7,176
kWh
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$581
Cost:
$125
$581 6,585 - - $581
6,585
kWh
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$546
Cost:
$25
$546 6,186 - - $546
6,186
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$39,328
Cost:
$57,912
$39,628 449,203 $(-300) - $39,628
449,203
kWh
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$8,814
Cost:
$3,461
$9,114 103,413 $(-300) - $9,114
103,413
kWh
$(-300)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes