IAC logo
IAC Assessment: WV0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2007
Principal Product graphite tubes and rods, graphitized powder, ceramic components/parts an
NAICS 335991 - Carbon and Graphite Product Manufacturing
SIC 3624 - Carbon And Graphite Products
Sales $5,000,000-$10,000,000
# of Employees 51
Plant Area (Sq.Ft.) 56,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,475 7,662,036 kWh $0.01
Electricity Demand $114,407 15,777 kW-months/year $7.25
Electricity Fees $9,170 - $ -
Natural Gas $443,955 51,144 MMBtu $8.68
TOTAL ENERGY COSTS $657,007
RECOMMENDED SAVINGS* $193,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,709
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$115,865
Cost:
$26,750
- - - - $116,060 13,371 $(-195) - -
-
kWh
-
-
kW-months/year
$116,060
13,371
MMBtu
$(-195)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$42,691
Cost:
$13,780
$3,013 257,547 $3,925 353 $35,753 4,119 - - $3,013
257,547
kWh
$3,925
353
kW-months/year
$35,753
4,119
MMBtu
-
-
$
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$13,999
Cost:
$13,900
$(-82) (-7,032) $(-111) (-10) $14,192 1,635 - - $(-82)
(-7,032)
kWh
$(-111)
(-10)
kW-months/year
$14,192
1,635
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,204
Cost:
$2,000
- - - - $10,399 1,198 $(-195) - -
-
kWh
-
-
kW-months/year
$10,399
1,198
MMBtu
$(-195)
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,012
Cost:
$15,100
- - - - $8,012 923 - - -
-
kWh
-
-
kW-months/year
$8,012
923
MMBtu
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,311
Cost:
$430
$566 48,355 $745 67 - - - - $566
48,355
kWh
$745
67
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$846
Cost:
-
$367 31,339 $479 43 - - - - $367
31,339
kWh
$479
43
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$657
Cost:
$276
$342 29,229 $445 40 - - $(-130) - $342
29,229
kWh
$445
40
kW-months/year
-
-
MMBtu
$(-130)
-
$
TOTAL RECOMMENDED Savings:
$193,585
Cost:
$72,236
$4,206 359,438 $5,483 493 $184,416 21,246 $(-520) - $4,206
359,438
kWh
$5,483
493
kW-months/year
$184,416
21,246
MMBtu
$(-520)
-
$
TOTAL IMPLEMENTED Savings:
$55,709
Cost:
$16,486
$4,288 366,470 $5,594 503 $46,152 5,317 $(-325) - $4,288
366,470
kWh
$5,594
503
kW-months/year
$46,152
5,317
MMBtu
$(-325)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes