Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2007 |
Principal Product | Printed Signs and Decals for Vending Machines |
NAICS | 323113 - Commercial Screen Printing |
SIC | 3993 - Signs And Advertising Specialities |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 1,080,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $209,286 | 3,331,756 | kWh | $0.06 |
Other Energy | $31,114 | 1,466 | MMBtu | $21.22 |
TOTAL ENERGY COSTS | $240,400 | |||
RECOMMENDED SAVINGS* | $90,893 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $68,770 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Administrative Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,046 Cost: $8,058 |
$18,046 | 287,269 | - | - | - | - | - | - |
$18,046 287,269 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $12,878 Cost: $8,630 |
- | - | $16,878 | 795 | - | - | $(-4,000) | - |
- - kWh |
$16,878 795 MMBtu |
- - $ |
$(-4,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $12,259 Cost: $122,100 |
$12,259 | 198,138 | - | - | - | - | - | - |
$12,259 198,138 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8112 COMBINE UTILITY METERS |
Savings: $11,248 Cost: $12,500 |
- | - | - | - | $11,248 | - | - | - |
- - kWh |
- - MMBtu |
$11,248 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $8,928 Cost: $511 |
$8,928 | 142,114 | - | - | - | - | - | - |
$8,928 142,114 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $8,228 Cost: $9,945 |
$8,228 | 130,971 | - | - | - | - | - | - |
$8,228 130,971 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,036 Cost: $984 |
$7,036 | 112,008 | - | - | - | - | - | - |
$7,036 112,008 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $5,820 Cost: $183 |
$5,820 | 92,664 | - | - | - | - | - | - |
$5,820 92,664 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,839 Cost: $1,105 |
$187 | 3,040 | $3,652 | 172 | - | - | - | - |
$187 3,040 kWh |
$3,652 172 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $2,611 Cost: $4,505 |
- | - | $2,611 | 123 | - | - | - | - |
- - kWh |
$2,611 123 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,893 Cost: $168,521 |
$60,504 | 966,204 | $23,141 | 1,090 | $11,248 | - | $(-4,000) | - | $60,504 966,204 kWh |
$23,141 1,090 MMBtu |
$11,248 - $ |
$(-4,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $68,770 Cost: $153,932 |
$53,281 | 851,156 | $19,489 | 918 | - | - | $(-4,000) | - | $53,281 851,156 kWh |
$19,489 918 MMBtu |
- - $ |
$(-4,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Administrative Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Administrative Changes | Ancillary Material Cost |