IAC Assessment: WV0372
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0372
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2008
Principal Product Rebuilt aircraft engines
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $100,000,000-$500,000,000
# of Employees 525
Plant Area (Sq.Ft.) 184,000
Annual Production 400 Pieces
Production Hrs. Annual 6,864
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,863 10,295,194 kWh $0.03
Electricity Demand $200,039 20,717 kW-months/year $9.66
Electricity Fees $2,434 - $ -
Natural Gas $377,149 33,861 MMBtu $11.14
TOTAL ENERGY COSTS $841,485
RECOMMENDED SAVINGS* $79,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,741
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,998
Cost:
$34,945
$17,416 685,665 $11,582 1,199 - - - - $17,416
685,665
kWh
$11,582
1,199
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,813
Cost:
$2,000
- - - - $13,903 1,248 $(-90) - -
-
kWh
-
-
kW-months/year
$13,903
1,248
MMBtu
$(-90)
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,188
Cost:
$511
$6,121 240,992 $4,067 421 - - - - $6,121
240,992
kWh
$4,067
421
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,107
Cost:
$540
- - - - $7,107 638 - - -
-
kWh
-
-
kW-months/year
$7,107
638
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,593
Cost:
$8,011
$2,975 117,138 $2,618 271 - - - - $2,975
117,138
kWh
$2,618
271
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$5,074
Cost:
$4,500
$3,360 132,294 $2,234 231 - - $(-520) - $3,360
132,294
kWh
$2,234
231
kW-months/year
-
-
MMBtu
$(-520)
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,550
Cost:
$890
$2,240 88,198 $1,490 154 - - $(-180) - $2,240
88,198
kWh
$1,490
154
kW-months/year
-
-
MMBtu
$(-180)
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,560
Cost:
$2,750
$1,768 69,597 $792 82 - - - - $1,768
69,597
kWh
$792
82
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,523
Cost:
-
$914 35,995 $609 42 - - - - $914
35,995
kWh
$609
42
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,153
Cost:
$460
$798 31,400 $355 37 - - - - $798
31,400
kWh
$355
37
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$79,559
Cost:
$54,607
$35,592 1,401,279 $23,747 2,437 $21,010 1,886 $(-790) - $35,592
1,401,279
kWh
$23,747
2,437
kW-months/year
$21,010
1,886
MMBtu
$(-790)
-
$
TOTAL IMPLEMENTED Savings:
$39,741
Cost:
$15,912
$15,610 614,617 $11,018 1,119 $13,903 1,248 $(-790) - $15,610
614,617
kWh
$11,018
1,119
kW-months/year
$13,903
1,248
MMBtu
$(-790)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes