IAC Assessment: WV0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2008
Principal Product BHT, MBMC Anti-oxidants
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 200,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $304,899 6,584,767 kWh $0.05
Electricity Demand $60,077 10,095 kW-months/year $5.95
Electricity Fees $3,852 - $ -
Natural Gas $1,583,617 189,209 MMBtu $8.37
TOTAL ENERGY COSTS $1,952,445
RECOMMENDED SAVINGS* $355,105 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $295,348
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$165,919
Cost:
$5,500
- - - - $173,979 20,786 $(-8,060) - -
-
kWh
-
-
kW-months/year
$173,979
20,786
MMBtu
$(-8,060)
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$109,212
Cost:
$38,900
- - - - $109,212 13,048 - - -
-
kWh
-
-
kW-months/year
$109,212
13,048
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,966
Cost:
$8,615
- - - - $18,966 2,266 - - -
-
kWh
-
-
kW-months/year
$18,966
2,266
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,388
Cost:
$8,615
- - - - $14,388 1,719 - - -
-
kWh
-
-
kW-months/year
$14,388
1,719
MMBtu
-
-
$
05: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$11,112
Cost:
$100,800
$6,114 613,200 $4,998 840 - - - - $6,114
613,200
kWh
$4,998
840
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$9,768
Cost:
$3,213
- - - - $9,768 1,167 - - -
-
kWh
-
-
kW-months/year
$9,768
1,167
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,784
Cost:
$224
- - - - $5,784 691 - - -
-
kWh
-
-
kW-months/year
$5,784
691
MMBtu
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$4,689
Cost:
$996
$4,361 94,192 $514 86 - - $(-186) - $4,361
94,192
kWh
$514
86
kW-months/year
-
-
MMBtu
$(-186)
-
$
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,240
Cost:
$1,000
$4,383 94,661 $518 87 - - $(-661) - $4,383
94,661
kWh
$518
87
kW-months/year
-
-
MMBtu
$(-661)
-
$
10: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$3,383
Cost:
$4,160
$(-101) (-2,173) $(-31) (-5) $3,515 420 - - $(-101)
(-2,173)
kWh
$(-31)
(-5)
kW-months/year
$3,515
420
MMBtu
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,016
Cost:
$195
$2,763 49,339 $253 45 - - - - $2,763
49,339
kWh
$253
45
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,884
Cost:
$3,093
$1,479 31,937 $405 68 - - - - $1,479
31,937
kWh
$405
68
kW-months/year
-
-
MMBtu
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,076
Cost:
$31
$915 19,772 $161 27 - - - - $915
19,772
kWh
$161
27
kW-months/year
-
-
MMBtu
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$902
Cost:
-
$765 16,521 $137 23 - - - - $765
16,521
kWh
$137
23
kW-months/year
-
-
MMBtu
-
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$766
Cost:
$3,539
$558 12,052 $208 35 - - - - $558
12,052
kWh
$208
35
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$355,105
Cost:
$178,881
$21,237 929,501 $7,163 1,206 $335,612 40,097 $(-8,907) - $21,237
929,501
kWh
$7,163
1,206
kW-months/year
$335,612
40,097
MMBtu
$(-8,907)
-
$
TOTAL IMPLEMENTED Savings:
$295,348
Cost:
$52,374
$9,362 191,876 $1,273 216 $292,959 35,001 $(-8,246) - $9,362
191,876
kWh
$1,273
216
kW-months/year
$292,959
35,001
MMBtu
$(-8,246)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes