Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2009 |
Principal Product | Pharmaceutical Pills |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 2,100 |
Plant Area (Sq.Ft.) | 1,459,343 |
Annual Production | 50,000,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,289,601 | 47,280,339 | kWh | $0.03 |
Electricity Demand | $620,337 | 86,041 | kW-months/year | $7.21 |
Electricity Fees | $37,635 | - | $ | - |
Natural Gas | $1,514,630 | 165,952 | MMBtu | $9.13 |
TOTAL ENERGY COSTS | $3,462,203 | |||
RECOMMENDED SAVINGS* | $493,360 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,366 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $153,645 Cost: $145,000 |
$12,472 | 457,193 | $4,492 | 623 | $136,681 | 15,053 | - | - | - | - |
$12,472 457,193 kWh |
$4,492 623 kW-months/year |
$136,681 15,053 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $81,057 Cost: $131,239 |
$55,000 | 2,016,116 | $26,057 | 3,614 | - | - | - | - | - | - |
$55,000 2,016,116 kWh |
$26,057 3,614 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $77,885 Cost: $17,000 |
$13,580 | 497,815 | - | - | $64,305 | 7,082 | - | - | - | - |
$13,580 497,815 kWh |
- - kW-months/year |
$64,305 7,082 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $56,916 Cost: $80,000 |
- | - | - | - | $56,916 | 6,234 | - | - | - | - |
- - kWh |
- - kW-months/year |
$56,916 6,234 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $40,984 Cost: $44,000 |
- | - | - | - | - | - | - | - | $40,984 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$40,984 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $26,130 Cost: $36,900 |
- | - | - | - | $26,130 | 2,862 | - | - | - | - |
- - kWh |
- - kW-months/year |
$26,130 2,862 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $17,728 Cost: - |
$12,121 | 444,330 | $5,607 | 771 | - | - | - | - | - | - |
$12,121 444,330 kWh |
$5,607 771 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $15,726 Cost: $1,000 |
- | - | - | - | $16,251 | 1,780 | $(-525) | - | - | - |
- - kWh |
- - kW-months/year |
$16,251 1,780 MMBtu |
$(-525) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $9,377 Cost: $49,300 |
- | - | - | - | $9,377 | 1,027 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,377 1,027 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $7,120 Cost: $5,500 |
- | - | - | - | $11,120 | 1,218 | $(-4,000) | - | - | - |
- - kWh |
- - kW-months/year |
$11,120 1,218 MMBtu |
$(-4,000) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,792 Cost: $19,960 |
$5,768 | 211,438 | $1,024 | 142 | - | - | - | - | - | - |
$5,768 211,438 kWh |
$1,024 142 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $493,360 Cost: $529,899 |
$98,941 | 3,626,892 | $37,180 | 5,150 | $320,780 | 35,256 | $(-4,525) | - | $40,984 | - | $98,941 3,626,892 kWh |
$37,180 5,150 kW-months/year |
$320,780 35,256 MMBtu |
$(-4,525) - $ |
$40,984 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,366 Cost: $26,460 |
$17,889 | 655,768 | $6,631 | 913 | $27,371 | 2,998 | $(-4,525) | - | - | - | $17,889 655,768 kWh |
$6,631 913 kW-months/year |
$27,371 2,998 MMBtu |
$(-4,525) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||