IAC Assessment: WV0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2010
Principal Product Thermoplastic hoses and tubing
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 174
Plant Area (Sq.Ft.) 17,000
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $420,895 8,400,464 kWh $0.05
Electricity Demand $222,123 17,363 kW-months/year $12.79
Natural Gas $87,875 10,808 MMBtu $8.13
TOTAL ENERGY COSTS $730,893
RECOMMENDED SAVINGS* $221,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $184,191
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$104,233
Cost:
$15,269
- - - - - - - - - - $104,233 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$104,233
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,861
Cost:
$27,401
$19,358 386,387 $9,503 743 - - - - - - - - $19,358
386,387
kWh
$9,503
743
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$15,520
Cost:
$7,000
- - - - $15,520 1,909 - - - - - - -
-
kWh
-
-
kW-months/year
$15,520
1,909
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$10,016
Cost:
$5,000
- - - - $10,016 1,232 - - - - - - -
-
kWh
-
-
kW-months/year
$10,016
1,232
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,436
Cost:
$24,000
- - - - $1,512 186 $5,824 - $1,100 - - - -
-
kWh
-
-
kW-months/year
$1,512
186
MMBtu
$5,824
-
$
$1,100
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,119
Cost:
$10,100
$4,778 95,377 $2,341 183 - - - - - - - - $4,778
95,377
kWh
$2,341
183
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,115
Cost:
$4,520
$4,774 95,286 $2,341 183 - - - - - - - - $4,774
95,286
kWh
$2,341
183
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,554
Cost:
$3,700
$4,392 87,655 $2,162 169 - - - - - - - - $4,392
87,655
kWh
$2,162
169
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$6,252
Cost:
$9,080
- - - - $6,252 769 - - - - - - -
-
kWh
-
-
kW-months/year
$6,252
769
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,903
Cost:
$2,278
$3,409 68,040 $1,674 136 - - $(-180) - - - - - $3,409
68,040
kWh
$1,674
136
kW-months/year
-
-
MMBtu
$(-180)
-
$
-
-
$
-
-
$
11: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$4,862
Cost:
$2,300
- - - - $4,862 598 - - - - - - -
-
kWh
-
-
kW-months/year
$4,862
598
MMBtu
-
-
$
-
-
$
-
-
$
12: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,744
Cost:
$2,000
$3,426 68,380 $1,688 132 - - $(-370) - - - - - $3,426
68,380
kWh
$1,688
132
kW-months/year
-
-
MMBtu
$(-370)
-
$
-
-
$
-
-
$
13: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,843
Cost:
$7,688
$2,577 51,434 $1,266 99 - - - - - - - - $2,577
51,434
kWh
$1,266
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
14: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,991
Cost:
$1,713
$2,006 40,033 $985 77 - - - - - - - - $2,006
40,033
kWh
$985
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
15: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,177
Cost:
$1,575
$1,461 29,167 $716 56 - - - - - - - - $1,461
29,167
kWh
$716
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
16: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,060
Cost:
$1,868
$1,320 26,362 $740 58 - - - - - - - - $1,320
26,362
kWh
$740
58
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
17: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,611
Cost:
$1,890
$(-122) (-2,444) $(-64) (-5) $1,797 221 - - - - - - $(-122)
(-2,444)
kWh
$(-64)
(-5)
kW-months/year
$1,797
221
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$221,297
Cost:
$127,382
$47,379 945,677 $23,352 1,831 $39,959 4,915 $5,274 - $1,100 - $104,233 - $47,379
945,677
kWh
$23,352
1,831
kW-months/year
$39,959
4,915
MMBtu
$5,274
-
$
$1,100
-
$
$104,233
-
$
TOTAL IMPLEMENTED Savings:
$184,191
Cost:
$80,269
$40,328 804,937 $19,798 1,553 $20,382 2,507 $(-550) - - - $104,233 - $40,328
804,937
kWh
$19,798
1,553
kW-months/year
$20,382
2,507
MMBtu
$(-550)
-
$
-
-
$
$104,233
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product