Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2010 |
Principal Product | Ceramic Brick Refractory |
NAICS | 327120 - Clay Building Material and Refractories Manufacturing |
SIC | 3297 - Nonclay Refractories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 165 |
Plant Area (Sq.Ft.) | 263,270 |
Annual Production | 4,875 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $697,275 | 15,695,025 | kWh | $0.04 |
Natural Gas | $2,598,207 | 338,719 | MMBtu | $7.67 |
TOTAL ENERGY COSTS | $3,295,482 | |||
RECOMMENDED SAVINGS* | $1,523,464 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $108,655 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $795,452 Cost: $529,924 |
- | - | $795,452 | 103,710 |
- - kWh |
$795,452 103,710 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $464,158 Cost: $180,000 |
- | - | $464,158 | 60,516 |
- - kWh |
$464,158 60,516 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $151,596 Cost: $109,360 |
$(-4,320) | (-97,234) | $155,916 | 20,328 |
$(-4,320) (-97,234) kWh |
$155,916 20,328 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $45,647 Cost: $65,720 |
$45,647 | 1,027,382 | - | - |
$45,647 1,027,382 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $31,815 Cost: $12,720 |
- | - | $31,815 | 4,148 |
- - kWh |
$31,815 4,148 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $27,235 Cost: $6,000 |
$27,235 | 612,988 | - | - |
$27,235 612,988 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,958 Cost: $3,400 |
- | - | $3,958 | 516 |
- - kWh |
$3,958 516 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,603 Cost: $1,272 |
$3,603 | 81,085 | - | - |
$3,603 81,085 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,523,464 Cost: $908,396 |
$72,165 | 1,624,221 | $1,451,299 | 189,218 | $72,165 1,624,221 kWh |
$1,451,299 189,218 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $108,655 Cost: $87,840 |
$72,882 | 1,640,370 | $35,773 | 4,664 | $72,882 1,640,370 kWh |
$35,773 4,664 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |