IAC Assessment: WV0407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2010
Principal Product organo functional silanes
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 457,000
Annual Production 38,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,655,601 55,103,450 kWh $0.03
Electricity Demand $877,398 88,405 kW-months/year $9.92
Natural Gas $4,177,623 560,430 MMBtu $7.45
TOTAL ENERGY COSTS $6,710,622
RECOMMENDED SAVINGS* $1,506,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $259,038
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM Savings:
$622,016
Cost:
$798,300
$(-3,392) (-73,518) - - $645,408 86,632 $(-20,000) - $(-3,392)
(-73,518)
kWh
-
-
kW-months/year
$645,408
86,632
MMBtu
$(-20,000)
-
$
02: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$542,540
Cost:
$1,200,000
$1,269,597 42,249,480 $574,130 57,876 $(-1,301,187) (-174,656) - - $1,269,597
42,249,480
kWh
$574,130
57,876
kW-months/year
$(-1,301,187)
(-174,656)
MMBtu
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$235,631
Cost:
$5,500
- - - - $258,671 34,721 $(-23,040) - -
-
kWh
-
-
kW-months/year
$258,671
34,721
MMBtu
$(-23,040)
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$43,962
Cost:
$96,200
- - - - $43,962 5,901 - - -
-
kWh
-
-
kW-months/year
$43,962
5,901
MMBtu
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$20,301
Cost:
$7,920
- - - - $20,301 2,725 - - -
-
kWh
-
-
kW-months/year
$20,301
2,725
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$19,102
Cost:
$43,400
- - - - $19,102 2,564 - - -
-
kWh
-
-
kW-months/year
$19,102
2,564
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$10,842
Cost:
$772
$7,995 266,069 $3,615 364 - - $(-768) - $7,995
266,069
kWh
$3,615
364
kW-months/year
-
-
MMBtu
$(-768)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,003
Cost:
$17,348
$3,274 108,939 $1,729 174 - - - - $3,274
108,939
kWh
$1,729
174
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,209
Cost:
$7,158
$2,207 73,435 $1,002 101 - - - - $2,207
73,435
kWh
$1,002
101
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,353
Cost:
$1,000
$5,997 199,551 $2,708 273 - - $(-4,352) - $5,997
199,551
kWh
$2,708
273
kW-months/year
-
-
MMBtu
$(-4,352)
-
$
TOTAL RECOMMENDED Savings:
$1,506,959
Cost:
$2,177,598
$1,285,678 42,823,956 $583,184 58,788 $(-313,743) (-42,113) $(-48,160) - $1,285,678
42,823,956
kWh
$583,184
58,788
kW-months/year
$(-313,743)
(-42,113)
MMBtu
$(-48,160)
-
$
TOTAL IMPLEMENTED Savings:
$259,038
Cost:
$31,778
$19,473 647,994 $9,054 912 $258,671 34,721 $(-28,160) - $19,473
647,994
kWh
$9,054
912
kW-months/year
$258,671
34,721
MMBtu
$(-28,160)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes