IAC Assessment: WV0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2010
Principal Product aluminium windows and doors
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $100,000,000-$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 900,000
Annual Production 2,160 Thousand Gallons
Production Hrs. Annual 6,120
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,622,448 22,318,638 kWh $0.07
Natural Gas $662,877 127,004 MMBtu $5.22
TOTAL ENERGY COSTS $2,285,325
RECOMMENDED SAVINGS* $463,677 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $201,014
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$108,743
Cost:
$89,900
- - $108,743 20,832 - - - - -
-
kWh
$108,743
20,832
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$89,967
Cost:
$129,542
- - $89,967 17,235 - - - - -
-
kWh
$89,967
17,235
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$77,291
Cost:
$154,121
$77,291 1,063,300 - - - - - - $77,291
1,063,300
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$59,435
Cost:
$55,000
$59,435 817,656 - - - - - - $59,435
817,656
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$41,697
Cost:
$9,404
- - $41,697 7,988 - - - - -
-
kWh
$41,697
7,988
MMBtu
-
-
$
-
-
$
06: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$24,889
Cost:
$9,534
$(-353) (-4,851) $25,317 4,850 $(-75) - - - $(-353)
(-4,851)
kWh
$25,317
4,850
MMBtu
$(-75)
-
$
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$14,418
Cost:
-
- - $14,418 2,762 - - - - -
-
kWh
$14,418
2,762
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,163
Cost:
$1,048
- - $12,163 2,330 - - - - -
-
kWh
$12,163
2,330
MMBtu
-
-
$
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$10,138
Cost:
$1,674
$12,448 171,247 - - $(-2,310) - - - $12,448
171,247
kWh
-
-
MMBtu
$(-2,310)
-
$
-
-
$
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,565
Cost:
$7,770
$6,565 90,313 - - - - - - $6,565
90,313
kWh
-
-
MMBtu
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,414
Cost:
-
$9,164 126,074 - - - - $(-2,750) - $9,164
126,074
kWh
-
-
MMBtu
-
-
$
$(-2,750)
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,242
Cost:
$16,759
$4,242 58,351 - - - - - - $4,242
58,351
kWh
-
-
MMBtu
-
-
$
-
-
$
13: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,528
Cost:
$1,876
$3,528 48,538 - - - - - - $3,528
48,538
kWh
-
-
MMBtu
-
-
$
-
-
$
14: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,830
Cost:
$6,571
$2,830 38,939 - - - - - - $2,830
38,939
kWh
-
-
MMBtu
-
-
$
-
-
$
15: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,069
Cost:
$1,000
- - $1,300 249 $(-231) - - - -
-
kWh
$1,300
249
MMBtu
$(-231)
-
$
-
-
$
16: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$288
Cost:
$357
$288 3,961 - - - - - - $288
3,961
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$463,677
Cost:
$484,556
$175,438 2,413,528 $293,605 56,246 $(-2,616) - $(-2,750) - $175,438
2,413,528
kWh
$293,605
56,246
MMBtu
$(-2,616)
-
$
$(-2,750)
-
$
TOTAL IMPLEMENTED Savings:
$201,014
Cost:
$245,016
$165,345 2,274,677 $41,035 7,861 $(-2,616) - $(-2,750) - $165,345
2,274,677
kWh
$41,035
7,861
MMBtu
$(-2,616)
-
$
$(-2,750)
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost