Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2010
Principal Product Thermoplastics resins
NAICS 325991 - Custom Compounding of Purchased Resins
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 200,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $728,201 11,745,600 kWh $0.06
Electricity Demand $215,647 26,956 kW-months/year $8.00
Natural Gas $165,514 14,148 MMBtu $11.70
TOTAL ENERGY COSTS $1,109,362
RECOMMENDED SAVINGS* $91,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,139
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$34,786
Cost:
$29,500
$7,286 117,493 - - - - - - $27,500 - $7,286
117,493
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$27,500
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,811
Cost:
$46,085
$18,131 292,433 $4,680 585 - - - - - - $18,131
292,433
kWh
$4,680
585
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,416
Cost:
$8,214
$8,175 131,850 $2,112 264 $129 11 - - - - $8,175
131,850
kWh
$2,112
264
kW-months/year
$129
11
MMBtu
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$6,314
Cost:
$1,220
$5,898 95,134 $1,496 187 - - $(-1,080) - - - $5,898
95,134
kWh
$1,496
187
kW-months/year
-
-
MMBtu
$(-1,080)
-
$
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,608
Cost:
$3,000
$4,424 71,351 $1,144 143 - - $(-960) - - - $4,424
71,351
kWh
$1,144
143
kW-months/year
-
-
MMBtu
$(-960)
-
$
-
-
$
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$3,780
Cost:
$4,485
$2,988 48,200 $792 99 - - - - - - $2,988
48,200
kWh
$792
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,311
Cost:
$7,750
- - - - $3,311 283 - - - - -
-
kWh
-
-
kW-months/year
$3,311
283
MMBtu
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,656
Cost:
$1,188
$2,094 33,776 $562 48 - - - - - - $2,094
33,776
kWh
$562
48
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,334
Cost:
$1,500
- - - - $2,469 211 $(-135) - - - -
-
kWh
-
-
kW-months/year
$2,469
211
MMBtu
$(-135)
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$976
Cost:
$1,290
$824 13,288 $152 19 - - - - - - $824
13,288
kWh
$152
19
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,992
Cost:
$104,232
$49,820 803,525 $10,938 1,345 $5,909 505 $(-2,175) - $27,500 - $49,820
803,525
kWh
$10,938
1,345
kW-months/year
$5,909
505
MMBtu
$(-2,175)
-
$
$27,500
-
$
TOTAL IMPLEMENTED Savings:
$49,139
Cost:
$61,207
$38,722 624,544 $9,994 1,227 $2,598 222 $(-2,175) - - - $38,722
624,544
kWh
$9,994
1,227
kW-months/year
$2,598
222
MMBtu
$(-2,175)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes