IAC Assessment: WV0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2011
Principal Product glass and vinyl windows
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 90,000
Annual Production 52,000 Pieces
Production Hrs. Annual 2,184
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,225 927,878 kWh $0.09
Natural Gas $40,874 4,215 MMBtu $9.70
TOTAL ENERGY COSTS $124,099
RECOMMENDED SAVINGS* $27,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,637
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,820
Cost:
$1,000
- - $11,883 1,225 $(-63) - -
-
kWh
$11,883
1,225
MMBtu
$(-63)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,303
Cost:
$29,900
$4,303 47,975 - - - - $4,303
47,975
kWh
-
-
MMBtu
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,561
Cost:
$4,294
- - $2,561 264 - - -
-
kWh
$2,561
264
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,594
Cost:
$458
$1,594 17,775 - - - - $1,594
17,775
kWh
-
-
MMBtu
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,328
Cost:
$10,400
$(-233) (-2,661) $2,561 264 $(-1,000) - $(-233)
(-2,661)
kWh
$2,561
264
MMBtu
$(-1,000)
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,319
Cost:
$268
- - $1,319 136 - - -
-
kWh
$1,319
136
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,208
Cost:
$905
$1,208 13,471 - - - - $1,208
13,471
kWh
-
-
MMBtu
-
-
$
08: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,197
Cost:
-
$1,197 13,343 - - - - $1,197
13,343
kWh
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$739
Cost:
$785
$739 8,424 - - - - $739
8,424
kWh
-
-
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$723
Cost:
$21
$723 8,057 - - - - $723
8,057
kWh
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$538
Cost:
$1,956
$538 5,996 - - - - $538
5,996
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,330
Cost:
$49,987
$10,069 112,380 $18,324 1,889 $(-1,063) - $10,069
112,380
kWh
$18,324
1,889
MMBtu
$(-1,063)
-
$
TOTAL IMPLEMENTED Savings:
$19,637
Cost:
$31,379
$7,817 87,150 $11,883 1,225 $(-63) - $7,817
87,150
kWh
$11,883
1,225
MMBtu
$(-63)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes