IAC logo
IAC Assessment: WV0430
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0430
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2011
Principal Product interior design display walls
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 320,000
Annual Production 40,000,000 Units
Production Hrs. Annual 4,030
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,123 7,496,141 kWh $0.10
Natural Gas $479,871 57,530 MMBtu $8.34
TOTAL ENERGY COSTS $1,204,994
RECOMMENDED SAVINGS* $280,817 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,084
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$70,581
Cost:
$20,000
- - - - $70,581 8,463 - - - - -
-
kWh
-
-
$
$70,581
8,463
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$43,659
Cost:
$3,500
- - - - $44,019 5,278 $(-360) - - - -
-
kWh
-
-
$
$44,019
5,278
MMBtu
$(-360)
-
$
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$39,290
Cost:
$65,840
- - - - $39,290 4,711 - - - - -
-
kWh
-
-
$
$39,290
4,711
MMBtu
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$34,733
Cost:
$26,650
$34,733 358,070 - - - - - - - - $34,733
358,070
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$28,475
Cost:
$76,200
$(-2,036) (-21,046) - - $34,511 4,138 - - $(-4,000) - $(-2,036)
(-21,046)
kWh
-
-
$
$34,511
4,138
MMBtu
-
-
$
$(-4,000)
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,696
Cost:
$37,805
- - - - - - - - $25,696 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
$25,696
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,692
Cost:
$37,460
$19,692 203,015 - - - - - - - - $19,692
203,015
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$10,426
Cost:
$20,000
- - $10,426 - - - - - - - -
-
kWh
$10,426
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$8,265
Cost:
$57,400
- - - - $8,265 991 - - - - -
-
kWh
-
-
$
$8,265
991
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$280,817
Cost:
$344,855
$52,389 540,039 $10,426 - $196,666 23,581 $(-360) - $21,696 - $52,389
540,039
kWh
$10,426
-
$
$196,666
23,581
MMBtu
$(-360)
-
$
$21,696
-
$
TOTAL IMPLEMENTED Savings:
$98,084
Cost:
$67,610
$54,425 561,085 - - $44,019 5,278 $(-360) - - - $54,425
561,085
kWh
-
-
$
$44,019
5,278
MMBtu
$(-360)
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes