IAC Assessment: WV0437
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0437
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2011
Principal Product Storm Doors
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 350,000
Annual Production 750,000 Pieces
Production Hrs. Annual 4,500
Location (State) VA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,367 3,359,044 kWh $0.06
Electricity Demand $77,296 9,674 kW-months/year $7.99
Other Gas $29,584 1,652 MMBtu $17.91
TOTAL ENERGY COSTS $309,247
RECOMMENDED SAVINGS* $63,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,182
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Personnel Changes Electricity Usage Electricity Demand Other Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,791
Cost:
$69,419
$26,443 438,885 $9,348 1,170 - - - - $26,443
438,885
kWh
$9,348
1,170
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,832
Cost:
$363
$5,787 96,044 $2,045 256 - - - - $5,787
96,044
kWh
$2,045
256
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,170
Cost:
$5,180
$3,107 51,575 $1,063 133 - - - - $3,107
51,575
kWh
$1,063
133
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,937
Cost:
$18,000
$3,304 54,845 $633 79 - - - - $3,304
54,845
kWh
$633
79
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,985
Cost:
$613
$2,522 41,856 $895 112 - - $(-432) - $2,522
41,856
kWh
$895
112
kW-months/year
-
-
MMBtu
$(-432)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,934
Cost:
$5,194
$1,942 32,230 $992 124 - - - - $1,942
32,230
kWh
$992
124
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,803
Cost:
$1,613
$2,068 34,324 $735 92 - - - - $2,068
34,324
kWh
$735
92
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,837
Cost:
$1,119
$1,358 22,535 $479 60 - - - - $1,358
22,535
kWh
$479
60
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,451
Cost:
$4,200
- - - - $1,451 81 - - -
-
kWh
-
-
kW-months/year
$1,451
81
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$63,740
Cost:
$105,701
$46,531 772,294 $16,190 2,026 $1,451 81 $(-432) - $46,531
772,294
kWh
$16,190
2,026
kW-months/year
$1,451
81
MMBtu
$(-432)
-
$
TOTAL IMPLEMENTED Savings:
$54,182
Cost:
$78,321
$40,120 665,874 $14,494 1,814 - - $(-432) - $40,120
665,874
kWh
$14,494
1,814
kW-months/year
-
-
MMBtu
$(-432)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Personnel Changes Electricity Usage Electricity Demand Other Gas Personnel Changes