IAC Assessment: WV0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2013
Principal Product ceramic fiber
NAICS 333414 - Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433 - Heating Equipment, Except Electric
Sales $5,000,000-$10,000,000
# of Employees 39
Plant Area (Sq.Ft.) 116,000
Annual Production 500,000 Pounds
Production Hrs. Annual 2,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,646 1,637,600 kWh $0.10
Natural Gas $75,616 11,160 MMBtu $6.78
TOTAL ENERGY COSTS $231,262
RECOMMENDED SAVINGS* $34,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,156
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,159
Cost:
$16,082
$12,159 127,927 - - - - $12,159
127,927
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,997
Cost:
$14,290
$8,997 94,655 - - - - $8,997
94,655
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,058
Cost:
$2,164
- - $3,058 451 - - -
-
kWh
$3,058
451
MMBtu
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$2,352
Cost:
$1,000
$3,437 36,158 - - $(-1,085) - $3,437
36,158
kWh
-
-
MMBtu
$(-1,085)
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,730
Cost:
$818
$1,730 18,205 - - - - $1,730
18,205
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,349
Cost:
$2,378
$1,349 14,197 - - - - $1,349
14,197
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,250
Cost:
-
$1,250 13,149 - - - - $1,250
13,149
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,099
Cost:
$5,677
$1,099 11,563 - - - - $1,099
11,563
kWh
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$933
Cost:
$214
$933 9,821 - - - - $933
9,821
kWh
-
-
MMBtu
-
-
$
10: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$560
Cost:
$500
$560 5,888 - - - - $560
5,888
kWh
-
-
MMBtu
-
-
$
11: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$534
Cost:
$61
$534 5,613 - - - - $534
5,613
kWh
-
-
MMBtu
-
-
$
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$116
Cost:
$164
$181 1,903 - - $(-65) - $181
1,903
kWh
-
-
MMBtu
$(-65)
-
$
13: 2.7122 DISCONNECT BALLASTS Savings:
$59
Cost:
$77
$59 618 - - - - $59
618
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,196
Cost:
$43,425
$32,288 339,697 $3,058 451 $(-1,150) - $32,288
339,697
kWh
$3,058
451
MMBtu
$(-1,150)
-
$
TOTAL IMPLEMENTED Savings:
$25,156
Cost:
$39,218
$25,156 264,669 - - - - $25,156
264,669
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes