IAC Assessment: WV0470
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0470
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2013
Principal Product leak proof vessels
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 133
Plant Area (Sq.Ft.) 200,000
Annual Production 750,000 Tons
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $476,682 7,249,285 kWh $0.07
Electricity Demand $66,721 19,097 kW-months/year $3.49
Electricity Fees $46,200 - $ -
Natural Gas $200,415 41,289 MMBtu $4.85
TOTAL ENERGY COSTS $790,018
RECOMMENDED SAVINGS* $65,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$24,095
Cost:
$2,500
- - - - $24,095 4,968 - - -
-
kWh
-
-
kW-months/year
$24,095
4,968
MMBtu
-
-
$
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$16,582
Cost:
$68,000
- - - - $16,582 3,419 - - -
-
kWh
-
-
kW-months/year
$16,582
3,419
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,807
Cost:
$20,200
$6,179 93,903 $628 180 - - - - $6,179
93,903
kWh
$628
180
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,666
Cost:
$1,080
- - - - $4,666 962 - - -
-
kWh
-
-
kW-months/year
$4,666
962
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,422
Cost:
$13,020
$(-173) (-2,635) $(-17) (-5) $4,612 951 - - $(-173)
(-2,635)
kWh
$(-17)
(-5)
kW-months/year
$4,612
951
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,069
Cost:
$2,050
$2,786 42,342 $283 81 - - - - $2,786
42,342
kWh
$283
81
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,736
Cost:
$1,700
- - - - $2,871 592 $(-135) - -
-
kWh
-
-
kW-months/year
$2,871
592
MMBtu
$(-135)
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,892
Cost:
$3,300
$1,717 26,087 $175 50 - - - - $1,717
26,087
kWh
$175
50
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$620
Cost:
$105
$564 8,565 $56 16 - - - - $564
8,565
kWh
$56
16
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$152
Cost:
$380
$301 4,581 $31 9 - - $(-180) - $301
4,581
kWh
$31
9
kW-months/year
-
-
MMBtu
$(-180)
-
$
TOTAL RECOMMENDED Savings:
$65,041
Cost:
$112,335
$11,374 172,843 $1,156 331 $52,826 10,892 $(-315) - $11,374
172,843
kWh
$1,156
331
kW-months/year
$52,826
10,892
MMBtu
$(-315)
-
$
TOTAL IMPLEMENTED Savings:
$51,768
Cost:
$75,435
$3,350 50,907 $339 97 $48,214 9,941 $(-135) - $3,350
50,907
kWh
$339
97
kW-months/year
$48,214
9,941
MMBtu
$(-135)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes