IAC logo
IAC Assessment: WV0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2013
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $50,000,000-$100,000,000
# of Employees 205
Plant Area (Sq.Ft.) 421,180
Annual Production 30,000 Thousand Gallons
Production Hrs. Annual 6,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $604,930 15,862,285 kWh $0.04
Electricity Demand $56,149 32,738 kW-months/year $1.72
Electricity Fees $5,698 - $ -
Natural Gas $656,768 135,876 MMBtu $4.83
TOTAL ENERGY COSTS $1,323,545
RECOMMENDED SAVINGS* $41,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,525
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,047
Cost:
$31,578
$14,717 386,278 $1,330 773 - - - - $14,717
386,278
kWh
$1,330
773
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,907
Cost:
$8,793
$6,334 166,255 $573 333 - - - - $6,334
166,255
kWh
$573
333
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,804
Cost:
$1,700
- - - - $5,023 1,040 $(-219) - -
-
kWh
-
-
kW-months/year
$5,023
1,040
MMBtu
$(-219)
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,703
Cost:
$1,000
$6,596 173,118 $595 346 - - $(-3,488) - $6,596
173,118
kWh
$595
346
kW-months/year
-
-
MMBtu
$(-3,488)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,539
Cost:
$7,466
$3,247 85,220 $292 170 - - - - $3,247
85,220
kWh
$292
170
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,574
Cost:
$3,281
- - - - $2,574 533 - - -
-
kWh
-
-
kW-months/year
$2,574
533
MMBtu
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,724
Cost:
$617
- - - - $1,724 357 - - -
-
kWh
-
-
kW-months/year
$1,724
357
MMBtu
-
-
$
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,529
Cost:
$3,263
$1,440 37,797 $89 52 - - - - $1,440
37,797
kWh
$89
52
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$497
Cost:
$566
$618 16,230 $55 32 - - $(-176) - $618
16,230
kWh
$55
32
kW-months/year
-
-
MMBtu
$(-176)
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$408
Cost:
$29
$374 9,811 $34 20 - - - - $374
9,811
kWh
$34
20
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,732
Cost:
$58,293
$33,326 874,709 $2,968 1,726 $9,321 1,930 $(-3,883) - $33,326
874,709
kWh
$2,968
1,726
kW-months/year
$9,321
1,930
MMBtu
$(-3,883)
-
$
TOTAL IMPLEMENTED Savings:
$15,525
Cost:
$14,042
$10,835 284,379 $976 568 $7,597 1,573 $(-3,883) - $10,835
284,379
kWh
$976
568
kW-months/year
$7,597
1,573
MMBtu
$(-3,883)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes