Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2014 |
Principal Product | plastic film |
NAICS | 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 267,000 |
Annual Production | 47,325,896 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $826,655 | 25,644,600 | kWh | $0.03 |
Electricity Demand | $679,947 | 45,477 | kW-months/year | $14.95 |
Fuel Oil #2 | $1,528,429 | 65,328 | MMBtu | $23.40 |
TOTAL ENERGY COSTS | $3,035,031 | |||
RECOMMENDED SAVINGS* | $527,428 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $287,866 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $177,357 Cost: $198,000 |
$(-682) | (-21,155) | $(-434) | (-29) | $182,473 | 7,798 | $(-4,000) | - |
$(-682) (-21,155) kWh |
$(-434) (-29) kW-months/year |
$182,473 7,798 MMBtu |
$(-4,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $135,791 Cost: $7,100 |
- | - | - | - | $137,124 | 5,860 | $(-1,333) | - |
- - kWh |
- - kW-months/year |
$137,124 5,860 MMBtu |
$(-1,333) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $37,833 Cost: - |
$23,137 | 717,640 | $14,696 | 983 | - | - | - | - |
$23,137 717,640 kWh |
$14,696 983 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $37,141 Cost: $51,865 |
$21,593 | 669,766 | $15,548 | 1,040 | - | - | - | - |
$21,593 669,766 kWh |
$15,548 1,040 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $35,144 Cost: $1,000 |
- | - | - | - | $35,264 | 1,507 | $(-120) | - |
- - kWh |
- - kW-months/year |
$35,264 1,507 MMBtu |
$(-120) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $31,791 Cost: $38,441 |
$19,442 | 603,025 | $12,349 | 826 | - | - | - | - |
$19,442 603,025 kWh |
$12,349 826 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $17,822 Cost: $26,000 |
$10,171 | 315,470 | $7,651 | 512 | - | - | - | - |
$10,171 315,470 kWh |
$7,651 512 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,536 Cost: $9,000 |
$8,274 | 256,628 | $5,262 | 352 | - | - | - | - |
$8,274 256,628 kWh |
$5,262 352 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $8,132 Cost: $27,380 |
$8,132 | 252,248 | - | - | - | - | - | - |
$8,132 252,248 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $7,886 Cost: $8,000 |
- | - | - | - | $7,886 | 337 | - | - |
- - kWh |
- - kW-months/year |
$7,886 337 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,903 Cost: $1,632 |
- | - | - | - | $6,903 | 295 | - | - |
- - kWh |
- - kW-months/year |
$6,903 295 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,231 Cost: $1,020 |
$3,809 | 118,141 | $2,422 | 162 | - | - | - | - |
$3,809 118,141 kWh |
$2,422 162 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,804 Cost: $200 |
$3,547 | 110,017 | $2,257 | 151 | - | - | - | - |
$3,547 110,017 kWh |
$2,257 151 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,427 Cost: $708 |
$2,833 | 87,876 | $1,794 | 120 | - | - | $(-1,200) | - |
$2,833 87,876 kWh |
$1,794 120 kW-months/year |
- - MMBtu |
$(-1,200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,123 Cost: $5,400 |
$2,123 | 65,862 | - | - | - | - | - | - |
$2,123 65,862 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $507 Cost: $1,167 |
$313 | 9,698 | $194 | 13 | - | - | - | - |
$313 9,698 kWh |
$194 13 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $527,428 Cost: $376,913 |
$102,692 | 3,185,216 | $61,739 | 4,130 | $369,650 | 15,797 | $(-6,653) | - | $102,692 3,185,216 kWh |
$61,739 4,130 kW-months/year |
$369,650 15,797 MMBtu |
$(-6,653) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $287,866 Cost: $137,113 |
$66,173 | 2,052,480 | $45,055 | 3,014 | $179,291 | 7,662 | $(-2,653) | - | $66,173 2,052,480 kWh |
$45,055 3,014 kW-months/year |
$179,291 7,662 MMBtu |
$(-2,653) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes |