IAC Assessment: WV0482
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0482
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2014
Principal Product plastic film
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 267,000
Annual Production 47,325,896 Pounds
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $826,655 25,644,600 kWh $0.03
Electricity Demand $679,947 45,477 kW-months/year $14.95
Fuel Oil #2 $1,528,429 65,328 MMBtu $23.40
TOTAL ENERGY COSTS $3,035,031
RECOMMENDED SAVINGS* $527,428 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $287,866
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$177,357
Cost:
$198,000
$(-682) (-21,155) $(-434) (-29) $182,473 7,798 $(-4,000) - $(-682)
(-21,155)
kWh
$(-434)
(-29)
kW-months/year
$182,473
7,798
MMBtu
$(-4,000)
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$135,791
Cost:
$7,100
- - - - $137,124 5,860 $(-1,333) - -
-
kWh
-
-
kW-months/year
$137,124
5,860
MMBtu
$(-1,333)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$37,833
Cost:
-
$23,137 717,640 $14,696 983 - - - - $23,137
717,640
kWh
$14,696
983
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,141
Cost:
$51,865
$21,593 669,766 $15,548 1,040 - - - - $21,593
669,766
kWh
$15,548
1,040
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$35,144
Cost:
$1,000
- - - - $35,264 1,507 $(-120) - -
-
kWh
-
-
kW-months/year
$35,264
1,507
MMBtu
$(-120)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,791
Cost:
$38,441
$19,442 603,025 $12,349 826 - - - - $19,442
603,025
kWh
$12,349
826
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$17,822
Cost:
$26,000
$10,171 315,470 $7,651 512 - - - - $10,171
315,470
kWh
$7,651
512
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,536
Cost:
$9,000
$8,274 256,628 $5,262 352 - - - - $8,274
256,628
kWh
$5,262
352
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,132
Cost:
$27,380
$8,132 252,248 - - - - - - $8,132
252,248
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$7,886
Cost:
$8,000
- - - - $7,886 337 - - -
-
kWh
-
-
kW-months/year
$7,886
337
MMBtu
-
-
$
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,903
Cost:
$1,632
- - - - $6,903 295 - - -
-
kWh
-
-
kW-months/year
$6,903
295
MMBtu
-
-
$
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,231
Cost:
$1,020
$3,809 118,141 $2,422 162 - - - - $3,809
118,141
kWh
$2,422
162
kW-months/year
-
-
MMBtu
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,804
Cost:
$200
$3,547 110,017 $2,257 151 - - - - $3,547
110,017
kWh
$2,257
151
kW-months/year
-
-
MMBtu
-
-
$
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,427
Cost:
$708
$2,833 87,876 $1,794 120 - - $(-1,200) - $2,833
87,876
kWh
$1,794
120
kW-months/year
-
-
MMBtu
$(-1,200)
-
$
15: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,123
Cost:
$5,400
$2,123 65,862 - - - - - - $2,123
65,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
16: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$507
Cost:
$1,167
$313 9,698 $194 13 - - - - $313
9,698
kWh
$194
13
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$527,428
Cost:
$376,913
$102,692 3,185,216 $61,739 4,130 $369,650 15,797 $(-6,653) - $102,692
3,185,216
kWh
$61,739
4,130
kW-months/year
$369,650
15,797
MMBtu
$(-6,653)
-
$
TOTAL IMPLEMENTED Savings:
$287,866
Cost:
$137,113
$66,173 2,052,480 $45,055 3,014 $179,291 7,662 $(-2,653) - $66,173
2,052,480
kWh
$45,055
3,014
kW-months/year
$179,291
7,662
MMBtu
$(-2,653)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes