Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2014 |
Principal Product | Structural Metal Towers |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 1,300,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $167,370 | 2,476,571 | kWh | $0.07 |
Electricity Demand | $103,381 | 8,509 | kW-months/year | $12.15 |
TOTAL ENERGY COSTS | $270,751 | |||
RECOMMENDED SAVINGS* | $49,532 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,125 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $27,561 Cost: $100,000 |
$18,521 | 274,064 | $9,040 | 744 | - | - |
$18,521 274,064 kWh |
$9,040 744 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,397 Cost: $51,976 |
$9,671 | 143,100 | $4,726 | 389 | - | - |
$9,671 143,100 kWh |
$4,726 389 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,550 Cost: $688 |
$2,384 | 35,281 | $1,166 | 96 | - | - |
$2,384 35,281 kWh |
$1,166 96 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $2,358 Cost: $1,000 |
$2,675 | 39,583 | $1,300 | 107 | $(-1,617) | - |
$2,675 39,583 kWh |
$1,300 107 kW-months/year |
$(-1,617) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $846 Cost: $3,700 |
$846 | 12,520 | - | - | - | - |
$846 12,520 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $558 Cost: $75 |
$376 | 5,557 | $182 | 15 | - | - |
$376 5,557 kWh |
$182 15 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $262 Cost: $519 |
$240 | 3,545 | $122 | 10 | $(-100) | - |
$240 3,545 kWh |
$122 10 kW-months/year |
$(-100) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,532 Cost: $157,958 |
$34,713 | 513,650 | $16,536 | 1,361 | $(-1,717) | - | $34,713 513,650 kWh |
$16,536 1,361 kW-months/year |
$(-1,717) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,125 Cost: $54,258 |
$15,346 | 227,066 | $7,496 | 617 | $(-1,717) | - | $15,346 227,066 kWh |
$7,496 617 kW-months/year |
$(-1,717) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |