IAC Assessment: WV0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2014
Principal Product metal stampings
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 70,000
Annual Production 2,000 Tons
Production Hrs. Annual 4,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,167 1,485,960 kWh $0.06
Electricity Demand $98,302 5,240 kW-months/year $18.76
Natural Gas $9,365 1,223 MMBtu $7.66
TOTAL ENERGY COSTS $196,834
RECOMMENDED SAVINGS* $53,203 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,014
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$19,660
Cost:
$10,500
- - $19,660 1,048 - - - - -
-
kWh
$19,660
1,048
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,418
Cost:
$17,825
$8,418 140,278 - - - - - - $8,418
140,278
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,336
Cost:
-
$2,785 46,408 $2,551 136 - - - - $2,785
46,408
kWh
$2,551
136
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,622
Cost:
$6,539
$2,371 39,506 $2,251 120 - - - - $2,371
39,506
kWh
$2,251
120
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,585
Cost:
-
$4,585 76,404 - - - - - - $4,585
76,404
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,770
Cost:
$1,000
$2,731 45,515 $2,514 134 - - $(-1,475) - $2,731
45,515
kWh
$2,514
134
kW-months/year
-
-
MMBtu
$(-1,475)
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,213
Cost:
$2,425
$1,675 27,905 $1,538 82 - - - - $1,675
27,905
kWh
$1,538
82
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,258
Cost:
$271
$658 10,957 $600 32 - - - - $658
10,957
kWh
$600
32
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$965
Cost:
$620
$534 8,892 $431 23 - - - - $534
8,892
kWh
$431
23
kW-months/year
-
-
MMBtu
-
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$812
Cost:
$1,375
- - - - $812 106 - - -
-
kWh
-
-
kW-months/year
$812
106
MMBtu
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$564
Cost:
$443
$414 6,904 $375 20 - - $(-225) - $414
6,904
kWh
$375
20
kW-months/year
-
-
MMBtu
$(-225)
-
$
TOTAL RECOMMENDED Savings:
$53,203
Cost:
$40,998
$24,171 402,769 $29,920 1,595 $812 106 $(-1,700) - $24,171
402,769
kWh
$29,920
1,595
kW-months/year
$812
106
MMBtu
$(-1,700)
-
$
TOTAL IMPLEMENTED Savings:
$19,014
Cost:
$9,235
$12,074 201,180 $6,940 370 - - - - $12,074
201,180
kWh
$6,940
370
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes