IAC Assessment: WV0490
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0490
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2014
Principal Product Recreational Vehicles
NAICS 336213 - Motor Home Manufacturing
SIC 3716 - Motor Homes
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 286,000
Annual Production 950 Units
Production Hrs. Annual 2,100
Location (State) OH
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,824 2,663,400 kWh $0.05
Electricity Demand $121,299 8,987 kW-months/year $13.50
Electricity Fees $1,320 - $ -
Natural Gas $136,190 19,822 MMBtu $6.87
TOTAL ENERGY COSTS $394,633
RECOMMENDED SAVINGS* $33,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,014
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$10,882
Cost:
$5,000
- - - - $10,882 1,584 - - -
-
kWh
-
-
kW-months/year
$10,882
1,584
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,883
Cost:
$16,722
$3,618 70,958 $5,265 390 - - - - $3,618
70,958
kWh
$5,265
390
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,124
Cost:
$1,000
$1,494 29,301 $2,255 167 - - $(-625) - $1,494
29,301
kWh
$2,255
167
kW-months/year
-
-
MMBtu
$(-625)
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,449
Cost:
$364
$977 19,160 $1,472 109 - - - - $977
19,160
kWh
$1,472
109
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$2,052
Cost:
$10,000
$(-111) (-2,186) $(-162) (-12) $2,425 353 $(-100) - $(-111)
(-2,186)
kWh
$(-162)
(-12)
kW-months/year
$2,425
353
MMBtu
$(-100)
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,812
Cost:
$500
- - - - $2,501 364 $(-689) - -
-
kWh
-
-
kW-months/year
$2,501
364
MMBtu
$(-689)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,569
Cost:
$3,905
$624 12,243 $945 70 - - - - $624
12,243
kWh
$945
70
kW-months/year
-
-
MMBtu
-
-
$
08: 2.1224 REPLACE BOILER Savings:
$1,367
Cost:
$5,170
- - - - $1,367 199 - - -
-
kWh
-
-
kW-months/year
$1,367
199
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$701
Cost:
$1,075
- - - - $701 102 - - -
-
kWh
-
-
kW-months/year
$701
102
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$381
Cost:
$51
$151 2,959 $230 17 - - - - $151
2,959
kWh
$230
17
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,220
Cost:
$43,787
$6,753 132,435 $10,005 741 $17,876 2,602 $(-1,414) - $6,753
132,435
kWh
$10,005
741
kW-months/year
$17,876
2,602
MMBtu
$(-1,414)
-
$
TOTAL IMPLEMENTED Savings:
$29,014
Cost:
$41,661
$5,108 100,175 $7,520 557 $17,175 2,500 $(-789) - $5,108
100,175
kWh
$7,520
557
kW-months/year
$17,175
2,500
MMBtu
$(-789)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes