IAC logo
IAC Assessment: WV0514
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2015
Principal Product Motors and Plastics
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 46,500
Annual Production 440,000 Pounds
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,910 2,008,800 kWh $0.07
Electricity Demand $53,154 4,998 kW-months/year $10.64
Natural Gas $52,832 7,478 MMBtu $7.06
TOTAL ENERGY COSTS $252,896
RECOMMENDED SAVINGS* $21,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,627
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,361
Cost:
$688
$3,403 46,550 $958 90 - - $3,403
46,550
kWh
$958
90
kW-months/year
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,286
Cost:
$11,500
$3,350 45,822 $936 88 - - $3,350
45,822
kWh
$936
88
kW-months/year
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,646
Cost:
$5,000
$2,848 38,962 $798 75 - - $2,848
38,962
kWh
$798
75
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,801
Cost:
$15,300
$2,482 33,954 $1,319 124 - - $2,482
33,954
kWh
$1,319
124
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,756
Cost:
$420
$1,373 18,786 $383 36 - - $1,373
18,786
kWh
$383
36
kW-months/year
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,663
Cost:
-
$1,301 17,798 $362 34 - - $1,301
17,798
kWh
$362
34
kW-months/year
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,005
Cost:
$256
$900 12,314 $255 24 $(-150) - $900
12,314
kWh
$255
24
kW-months/year
$(-150)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$842
Cost:
$50
$661 9,037 $181 17 - - $661
9,037
kWh
$181
17
kW-months/year
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$530
Cost:
$2,104
$413 5,655 $117 11 - - $413
5,655
kWh
$117
11
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$21,890
Cost:
$35,318
$16,731 228,878 $5,309 499 $(-150) - $16,731
228,878
kWh
$5,309
499
kW-months/year
$(-150)
-
$
TOTAL IMPLEMENTED Savings:
$9,627
Cost:
$1,414
$7,638 104,485 $2,139 201 $(-150) - $7,638
104,485
kWh
$2,139
201
kW-months/year
$(-150)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes